Also see:
2.18.2.1.1 Compliance
Solar PV and ancillary equipment shall comply with the Technical Requirements. Issues to be taken into account include:
- relevant standards
- product certification
- operative competency.
8.2.1.1.1 Relevant standards
Solar PV and/or batteries should comply with relevant standards including where applicable:
BS EN 61215-1 | Terrestrial photovoltaic (PV) modules. Design qualification and type approval |
BS EN 61215-2 | Terrestrial photovoltaic (PV) modules. Design qualification and type approval – Test procedures |
BS EN 60068 | Environmental testing |
BS EN IEC 61730 | Photovoltaic (PV) module safety qualification |
BS EN IEC 62108 | Concentrator photovoltaic (CPV) modules and assemblies. Design qualification and type approval |
MCS 005 | Product Certification Scheme Requirements: Solar Photovoltaic Modules |
MCS 012 | The Roof Fixing Standard (Product) |
MCS 3002 | The Solar PV Standard (Installation) |
MIS 3012 | The MCS Battery Standard (Installation) |
PAS 63100 | Electrical installations – Protection against fire of battery energy storage systems for use in dwellings |
8.2.1.1.2 Product certification
Solar PV and/or battery technologies should have current certification confirming satisfactory assessment by an appropriate independent authority acceptable to NHBC.
Solar PV products that are certified through the Microgeneration Certification Scheme (MCS) will generally be acceptable to NHBC. Certification and test documentation should be made available to NHBC upon request.
Other certification bodies or test documentation may be acceptable where they are considered by NHBC to be a suitable alternative.
8.2.1.1.3 Operative competency
Solar PV systems should be installed by companies, organisations or operatives who are:
- competent and familiar with the system being installed, and
- MCS Certified, or
- certified to a standard acceptable to NHBC.
Last updated: 2nd January 2025