4.3.13 Construction joints
Construction joints in strip and trench fill foundations shall be suitably formed.
Where construction joints are unavoidable:
- they should not be positioned near a return in the foundation beyond the construction joint
- all shuttering should be removed before work continues.
Construction joints for strip and trench fill foundations may be formed by one of the methods shown below:
Last updated: 2nd January 2024