8.4.2.11 Commissioning and balancing
MEV design, materials and sitework shall be tested and commissioned in accordance with the commissioning schedule.
Upon completion of the installation MVHR systems should be protected from dust during the construction of the home. Where possible the system should be switched off and dust covers applied to air valves.
Last updated: 2nd January 2024