8.5.1.11 Sequence of work
Solar thermal hot water systems shall be installed in accordance with a suitable schedule.
To ensure performance, solar thermal hot water systems and ancillary components should be installed in a logical and timely sequence in accordance with the manufacturer’s recommendations.
Last updated: 2nd January 2024