8.3.2.9 Sequence of work
Gas heating systems shall be installed in accordance with a suitable schedule.
To ensure performance, gas heating systems and ancillary components should be installed in a logical and timely sequence in accordance with the manufacturer’s recommendations.
Last updated: 2nd January 2025