NHBC
  • Home
  • 1 Welcome
    • 1.1 Contact us
    • 1.2 What’s changed
  • 2 Introduction
    • 2.1 The Standards and Technical Requirements
    • 2.2 3D Models
  • 3 General
    • 3.1 Concrete and its reinforcement
      • 3.1.1 Compliance
      • 3.1.2 Provision of information
      • 3.1.3 Storage of materials
      • 3.1.4 Site-mixed concrete
      • 3.1.5 Ready-mixed concrete
      • 3.1.6 Concrete specification
      • 3.1.7 Admixtures
      • 3.1.8 Special types of concrete
      • 3.1.9 Design of reinforced concrete
      • 3.1.10 Installation of reinforcement
      • 3.1.11 Blinding concrete
      • 3.1.12 Formwork
      • 3.1.13 Before concreting
      • 3.1.14 Casting
      • 3.1.15 Curing
      • 3.1.16 Testing
      • 3.1.17 Glossary
      • Figure reference table
    • 3.2 Cold weather working
      • 3.2.1 Compliance
      • 3.2.2 External conditions
      • 3.2.3 Materials
      • 3.2.4 Concreting
      • 3.2.5 Masonry
      • 3.2.6 Rendering, plastering and screeding
      • 3.2.7 Admixtures
      • 3.2.8 Painting
    • 3.3 Timber preservation (natural solid timber)
      • 3.3.1 Compliance
      • 3.3.2 Durability
      • 3.3.3 Sitework
      • 3.3.4 Protection and storage
      • 3.3.5 Treatment of cut surfaces
      • 3.3.6 Compatibility with metal
      • 3.3.7 Further information
      • Figure reference table
  • 4 Foundations
    • 4.1 Land quality – managing ground conditions
      • 4.1.1 Compliance
      • 4.1.2 Initial Assessment – desk study (all sites)
      • 4.1.3 Initial Assessment – walkover survey (all sites)
      • 4.1.4 Initial Assessment – results
      • 4.1.5 Basic Investigation (sites where hazards are not identified or suspected)
      • 4.1.6 Detailed Investigation (sites where hazards are identified or suspected)
      • 4.1.7 Managing the risks (sites where hazards are found)
      • 4.1.8 Unforeseen hazards
      • 4.1.9 Documentation and verification
      • 4.1.10 Guidance for investigations
      • 4.1.11 Further information
      • Figure reference table
    • 4.2 Building near trees
      • 4.2.1 Compliance
      • 4.2.2 Provision of information
      • 4.2.3 Building near trees
      • 4.2.4 The effects of trees on shrinkable soils
      • 4.2.5 Foundations in all soil types
      • 4.2.6 Excavation of foundations
      • 4.2.7 Foundations in shrinkable soils
      • 4.2.8 Design and construction of foundations in shrinkable soils
      • 4.2.9 Foundation depths for specific conditions in shrinkable soils
      • 4.2.10 Heave precautions
      • 4.2.11 New drainage
      • 4.2.12 Method of assessment of foundation depths using charts
      • 4.2.13 Method of assessment of foundation depths using tables
      • 4.2.14 Worked example
      • 4.2.15 Further information
    • 4.3 Strip and trench fill foundations
      • 4.3.1 Compliance
      • 4.3.2 Provision of information
      • 4.3.3 Ground conditions
      • 4.3.4 Hazardous ground
      • 4.3.5 Setting out
      • 4.3.6 Services and drainage
      • 4.3.7 Safe transmission of loads
      • 4.3.8 Sloping ground and stepped foundations
      • 4.3.9 Excavations
      • 4.3.10 Reinforcement
      • 4.3.11 Concrete
      • 4.3.12 Movement joints
      • 4.3.13 Construction joints
    • 4.4 Raft, pile, pier and beam foundations
      • 4.4.1 Compliance
      • 4.4.2 Provision of information
      • 4.4.3 Site conditions
      • 4.4.4 Hazardous ground
      • 4.4.5 Services and drainage
      • 4.4.6 Safe transmission of loads
      • 4.4.7 Construction
      • 4.4.8 Engineer checks
      • 4.4.9 Compressible materials
      • 4.4.10 Reinforcement
      • 4.4.11 Concrete
      • 4.4.12 Movement joints
      • 4.4.13 Resistance to moisture
    • 4.5 Vibratory ground improvement techniques
      • 4.5.1 Compliance
      • 4.5.2 Hazardous sites and ground hazards
      • 4.5.3 Desk study and site investigation
      • 4.5.4 Confirmation of suitability for treatment
      • 4.5.5 Suitability of ground conditions
      • 4.5.6 Compatibility of the ground, design and treatment
      • 4.5.7 Acceptable methods
      • 4.5.8 Materials for use as fill
      • 4.5.9 Granular material
      • 4.5.10 Sitework
      • 4.5.11 Adjacent excavations
      • 4.5.12 Verification of completed treatment
    • 4.6 Engineered fill
      • 4.6.1 Compliance
      • 4.6.2 Provision of information
      • 4.6.3 Hazardous sites and ground hazards
      • 4.6.4 Desk study and ground investigation
      • 4.6.5 Suitability of ground conditions
      • 4.6.6 Materials for use as engineered fill
      • 4.6.7 Design and specification of earthworks
      • 4.6.8 Compatibility of fill with foundations, infrastructure and external works
      • 4.6.9 Acceptable methods of earthworks filling
      • 4.6.10 Site work
      • 4.6.11 Adjacent excavations
      • 4.6.12 Verification of engineered fill
      • 4.6.13 Reporting
      • Figure reference table
  • 5 Substructure, Ground Floors, Drainage and Basements
    • 5.1 Substructure and ground-bearing floors
      • 5.1.1 Compliance
      • 5.1.2 Provision of information
      • 5.1.3 Transfer of loads
      • 5.1.4 Ground conditions
      • 5.1.5 Services and drainage
      • 5.1.6 Ground below fill
      • 5.1.7 Fill below floors
      • 5.1.8 Infill up to 600mm deep
      • 5.1.9 Materials used for fill
      • 5.1.10 Harmful or toxic materials
      • 5.1.11 Regulatory solutions
      • 5.1.12 Walls below the DPC
      • 5.1.13 Durability
      • 5.1.14 Mortar
      • 5.1.15 Wall ties
      • 5.1.16 Blinding
      • 5.1.17 Ground floor slab and concrete
      • 5.1.18 Laying the ground-bearing floor slab
      • 5.1.19 Damp proof course
      • 5.1.20 Damp proofing concrete floors
      • 5.1.21 Thermal insulation
      • 5.1.22 Installation of insulation
      • 5.1.23 Further information
      • Figure reference table
    • 5.2 Suspended ground floors
      • 5.2.1 Compliance
      • 5.2.2 Provision of information
      • 5.2.3 Contaminants
      • 5.2.4 Proprietary systems
      • 5.2.5 Transfer of loads: concrete floors
      • 5.2.6 Reinforced concrete
      • 5.2.7 Construction of suspended concrete ground floors
      • 5.2.8 Transfer of loads: timber floors
      • 5.2.9 Thermal insulation and thermal bridging
      • 5.2.10 Damp proofing and ventilation
      • 5.2.11 Floor finishes
      • 5.2.12 Floor decking
    • 5.3 Drainage below ground
      • 5.3.1 Compliance
      • 5.3.2 Provision of information
      • 5.3.3 Preliminary work
      • 5.3.4 Foul and surface water disposal
      • 5.3.5 Drainage system performance
      • 5.3.6 Ground water drainage
      • 5.3.7 Design to avoid damage and blockages
      • 5.3.8 Durability
      • 5.3.9 Septic tanks and cesspools
      • 5.3.10 Septic tank outputs
      • 5.3.11 Surface water soakaways
      • 5.3.12 Component requirements
      • 5.3.13 Excavation
      • 5.3.14 Protection of pipework
      • 5.3.15 Laying pipework
      • 5.3.16 Protection of work
      • 5.3.17 Testing
    • 5.4 Waterproofing of basements and other below ground structures
      • 5.4.1 Compliance
      • 5.4.2 Provision of information
      • 5.4.3 Waterproofing
      • 5.4.4 Ground conditions
      • 5.4.5 Structural stability
      • 5.4.6 Design considerations
      • 5.4.7 Waterproofing systems
      • 5.4.8 Handling, storage and protection
      • 5.4.9 Buried podiums
      • Figure reference table
  • 6 Superstructure (excluding roofs)
    • 6.1 External masonry walls
      • 6.1.1 Compliance
      • 6.1.2 Provision of information
      • 6.1.3 Structural design
      • 6.1.4 Fire resistance
      • 6.1.5 Acoustic resistance
      • 6.1.6 Exposure
      • 6.1.7 Thermal insulation
      • 6.1.8 Concrete blocks
      • 6.1.9 Bricks
      • 6.1.10 Stone masonry
      • 6.1.11 Construction of masonry walls
      • 6.1.12 Lintels
      • 6.1.13 Materials suitable for mortar
      • 6.1.14 Mortar
      • 6.1.15 Render
      • 6.1.16 Cladding
      • 6.1.17 DPCs and cavity trays
      • 6.1.18 Wall ties, bed joint reinforcements and windposts
      • 6.1.19 Handling materials
      • 6.1.20 Protection of the works during construction
      • Figure reference table
    • 6.2 External timber framed walls
      • 6.2.1 Compliance
      • 6.2.2 Provision of information
      • 6.2.3 Design checking and certification
      • 6.2.4 Load-bearing walls
      • 6.2.5 Fixing the frame
      • 6.2.6 Nails and staples
      • 6.2.7 Sheathing
      • 6.2.8 Differential movement
      • 6.2.9 Fire resistance
      • 6.2.10 Protection from moisture
      • 6.2.11 Timber preservation
      • 6.2.12 Air and vapour control layers
      • 6.2.13 Breather membranes
      • 6.2.14 Wall ties and fixings
      • 6.2.15 Insulation
      • Figure reference table
    • 6.3 Internal walls
      • 6.3.1 Compliance
      • 6.3.2 Provision of information
      • 6.3.3 Supporting load-bearing internal walls
      • 6.3.4 Masonry walls
      • 6.3.5 Load-bearing timber walls
      • 6.3.6 Fire resistance
      • 6.3.7 Sound insulation
      • 6.3.8 Partitions: internal non load-bearing
      • 6.3.9 Construction of timber partitions
      • 6.3.10 Construction of steel framed partitions
      • 6.3.11 Construction of proprietary systems
      • 6.3.12 Plasterboard
      • 6.3.13 Damp proof courses
      • 6.3.14 Components
      • Figure reference table
    • 6.4 Timber and concrete upper floors
      • 6.4.1 Compliance
      • 6.4.2 Provision of information
      • 6.4.3 Upper floor design
      • 6.4.4 Fire spread
      • 6.4.5 Sound insulation
      • 6.4.6 In-situ concrete floors and concreting
      • 6.4.7 Precast concrete
      • 6.4.8 Timber joist spans
      • 6.4.9 Timber joist performance
      • 6.4.10 Construction of timber floors
      • 6.4.11 Joists supported by intermediate walls
      • 6.4.12 Joists connected to steel
      • 6.4.13 Joists into hangers
      • 6.4.14 Timber joist and restraint strap
      • 6.4.15 Strutting
      • 6.4.16 Joists and openings
      • 6.4.17 Multiple joists
      • 6.4.18 Notching and drilling
      • 6.4.19 Floor decking
      • 6.4.20 Floating floors or floors between homes
    • 6.5 Steelwork
      • 6.5.1 Compliance
      • 6.5.2 Design guidance
      • 6.5.3 Steel grade and coatings
      • 6.5.4 Installation and support
      • 6.5.5 Padstones
      • 6.5.6 Connections
      • 6.5.7 Examples
      • Figure reference table
    • 6.6 Staircases
      • 6.6.1 Compliance
      • 6.6.2 Provision of information
      • 6.6.3 Fire precautions
      • 6.6.4 Lighting
      • 6.6.5 Glazing
      • 6.6.6 Structural design
      • 6.6.7 Headroom and width
      • 6.6.8 Design of steps
      • 6.6.9 Landings
      • 6.6.10 Guarding
      • 6.6.11 Handrails
      • 6.6.12 Staircases made from timber and wood-based products
      • 6.6.13 Concrete staircases
      • 6.6.14 Steel staircases
      • 6.6.15 Proprietary staircase units
      • 6.6.16 Protection
      • Figure reference table
    • 6.7 Doors, windows, and glazing
      • 6.7.1 Compliance
      • 6.7.2 Provision of information
      • 6.7.3 In-service performance
      • 6.7.4 Coupled door and window frame assemblies
      • 6.7.5 Glazing
      • 6.7.6 Security
      • 6.7.7 Timber doors and windows
      • 6.7.8 Non-timber doors and windows
      • 6.7.9 Ironmongery
      • 6.7.10 Material storage and protection
      • 6.7.11 Installation
      • 6.7.12 Completed work
      • Figure reference table
    • 6.8 Fireplaces, chimneys and flues
      • 6.8.1 Compliance
      • 6.8.2 Provision of information
      • 6.8.3 Solid fuel – fireplaces and hearths
      • 6.8.4 Solid fuel – combustion air
      • 6.8.5 Solid fuel – flue pipes
      • 6.8.6 Solid fuel – chimneys
      • 6.8.7 Solid fuel – outlets and terminals
      • 6.8.8 Gas – fireplaces and hearths
      • 6.8.9 Gas – combustion air
      • 6.8.10 Gas – flue pipes
      • 6.8.11 Gas – chimneys
      • 6.8.12 Gas – outlets and terminals
      • 6.8.13 Oil – fireplaces and hearths
      • 6.8.14 Oil – combustion air
      • 6.8.15 Oil – flue pipes
      • 6.8.16 Oil – chimneys
      • 6.8.17 Oil – outlets and terminals
      • 6.8.18 All – fireplaces and hearths
      • 6.8.19 All – fireplace surrounds
      • 6.8.20 All – flue pipes
      • 6.8.21 All – flue liners
      • 6.8.22 All – flues
      • 6.8.23 All – chimneys
      • 6.8.24 Masonry
      • 6.8.25 Mortar
      • 6.8.26 DPC
      • 6.8.27 Flashings
      • 6.8.28 Terminals
      • 6.8.29 Flue testing
      • 6.8.30 Further information
    • 6.9 Curtain walling and cladding
      • 6.9.1 Compliance
      • 6.9.2 Provision of information
      • 6.9.3 Certification
      • 6.9.4 Loads
      • 6.9.5 Support and fixings
      • 6.9.6 Durability
      • 6.9.7 Interfaces
      • 6.9.8 Insulation
      • 6.9.9 Damp proofing and vapour control
      • 6.9.10 Installation and tolerances
      • 6.9.11 Electrical continuity and earth bonding
      • 6.9.12 Maintenance
      • 6.9.13 Glazing, gaskets and sealants
      • 6.9.14 Cavity barriers and firestops
      • 6.9.15 Ventilation screens
      • 6.9.16 Handling and storage
      • 6.9.17 Curtain walling
      • 6.9.18 Rainscreen cladding
      • 6.9.19 Insulated render and brick slip cladding
    • 6.10 Light steel framed walls and floors
      • 6.10.1 Compliance
      • 6.10.2 Provision of information
      • 6.10.3 Structural certification
      • 6.10.4 Structural design of load-bearing floors and walls
      • 6.10.5 Structural design of infill walls
      • 6.10.6 Roofs
      • 6.10.7 Steel and fixings
      • 6.10.8 Detailing of steel joists
      • 6.10.9 Restraint
      • 6.10.10 Construction of load-bearing walls and external infill walls
      • 6.10.11 Interfaces with staircases
      • 6.10.12 Fixing floor decking and ceilings
      • 6.10.13 Other design issues
      • 6.10.14 Behaviour in relation to fire
      • 6.10.15 Acoustic performance
      • 6.10.16 Moisture control
      • 6.10.17 Insulation
      • 6.10.18 Air and vapour control layers
      • 6.10.19 Breather membranes
      • 6.10.20 Cladding, lining and sheathing boards
      • 6.10.21 Wall ties
      • 6.10.22 Services
      • 6.10.23 Further information
      • Figure reference table
    • 6.11 Render
      • 6.11.1 Compliance
      • 6.11.2 Provision of information
      • 6.11.3 Weather conditions
      • 6.11.4 Backgrounds
      • 6.11.5 Accommodation of movement
      • 6.11.6 Mixes
      • 6.11.7 Detailing
      • 6.11.8 Render onto board backgrounds
      • 6.11.9 Finishes
      • Figure reference table
  • 7 Roofs
    • 7.1 Flat roofs, terraces and balconies
      • 7.1.1 Compliance
      • 7.1.2 Provision of information
      • 7.1.3 Flat roof, terrace and balcony general design
      • 7.1.4 Drainage
      • 7.1.5 Flat roof, terrace and balcony structural design
      • 7.1.6 Timber structure and deck
      • 7.1.7 Concrete decks
      • 7.1.8 Profiled self-supporting metal roof decks
      • 7.1.9 Profiled self-supporting metal roofing
      • 7.1.10 Thermal insulation and vapour control
      • 7.1.11 Waterproofing layer and surface treatments
      • 7.1.12 Green and biodiverse (brown roofs) – including roof gardens
      • 7.1.13 Blue roofs
      • 7.1.14 Raised and buried podiums
      • 7.1.15 Detailing of flat roofs
      • 7.1.16 Accessible thresholds and upstands
      • 7.1.17 Metal balcony decking systems
      • 7.1.18 Parapets and guarding to terraces and balconies
    • 7.2 Pitched roofs
      • 7.2.1 Compliance
      • 7.2.2 Provision of information
      • 7.2.3 Design of pitched roofs
      • 7.2.4 Protection of trusses
      • 7.2.5 Durability
      • 7.2.6 Wall plates
      • 7.2.7 Joints and connections
      • 7.2.8 Restraint
      • 7.2.9 Bracing for trussed rafter roofs
      • 7.2.10 Strutting for site formed attic trusses and cut roofs that form a floor
      • 7.2.11 Support for equipment
      • 7.2.12 Access
      • 7.2.13 Dormer construction
      • 7.2.14 Underlay, sarking boards and sheets
      • 7.2.15 Ventilation, vapour control and insulation
      • 7.2.16 Fire-stopping and cavity barriers
      • 7.2.17 Battens
      • 7.2.18 Roof coverings
      • 7.2.19 Fixing tiles and slates
      • 7.2.20 Weathering details
      • 7.2.21 Valleys and hidden gutters
      • 7.2.22 Drainage
      • 7.2.23 Fascias and trim
      • 7.2.24 Spandrel panels in cold roofs
      • 7.2.25 Roof cassette systems
      • 7.2.26 Solar roof panels
      • Figure reference table
  • 8 Services
    • 8.1 Internal services
      • 8.1.1 Compliance
      • 8.1.2 Provision of information
      • 8.1.3 Water services and supply
      • 8.1.4 Cold water storage
      • 8.1.5 Gas services
      • 8.1.6 Electrical services
      • 8.1.7 Meter boxes
      • 8.1.8 Hot water services
      • 8.1.9 Unvented storage systems
      • 8.1.10 Soil and waste systems internal
      • Figure reference table
    • 8.2 Electrical generating technologies
      • 8.2.1 Solar photovoltaics (PV)
        • 8.2.1.1 Compliance
        • 8.2.1.2 Provision of information
        • 8.2.1.3 System design
        • 8.2.1.4 Building integration
        • 8.2.1.5 Fixing
        • 8.2.1.6 Access
        • 8.2.1.7 Electrical installation requirements
        • 8.2.1.8 Handling and storage
        • 8.2.1.9 Sequence of work
        • Figure reference table
      • 8.2.2 Wind turbines
        • 8.2.2.1 Compliance
        • 8.2.2.2 Provision of information
        • 8.2.2.3 System design
        • 8.2.2.4 Building integration
        • 8.2.2.5 Fixing
        • 8.2.2.6 Access
        • 8.2.2.7 Electrical installation requirements
        • 8.2.2.8 Handling and storage
        • 8.2.2.9 Sequence of work
        • Figure reference table
    • 8.3 Space heating systems
      • 8.3.1 Space heating
        • 8.3.1.1 Requirements
      • 8.3.2 Gas heating appliances
        • 8.3.2.1 Compliance
        • 8.3.2.2 Provision of information
        • 8.3.2.3 System design
        • 8.3.2.4 Building integration
        • 8.3.2.5 Fixing
        • 8.3.2.6 Access
        • 8.3.2.7 Electrical installation requirements
        • 8.3.2.8 Handling and storage
        • 8.3.2.9 Sequence of work
      • 8.3.3 Heat pumps
        • 8.3.3.1 Compliance
        • 8.3.3.2 Provision of information
        • 8.3.3.3 System design
        • 8.3.3.4 Pipes, insulation and protection from cold
        • 8.3.3.5 Ground collectors
        • 8.3.3.6 Building integration
        • 8.3.3.7 Fixing
        • 8.3.3.8 Access
        • 8.3.3.9 Electrical installation requirements
        • 8.3.3.10 Handling and storage
        • 8.3.3.11 Sequence of work
        • Figure reference table
      • 8.3.4 Biomass
        • 8.3.4.1 Compliance
        • 8.3.4.2 Clean air act
        • 8.3.4.3 Fuel storage
        • Figure reference table
    • 8.4 Ventilation
      • 8.4.1 Mechanical ventilation and heat recovery (MVHR)
        • 8.4.1.1 Compliance
        • 8.4.1.2 Provision of information
        • 8.4.1.3 System design
        • 8.4.1.4 Acoustics
        • 8.4.1.5 Building integration
        • 8.4.1.6 Ductwork
        • 8.4.1.7 Fixing and jointing of ductwork
        • 8.4.1.8 Access and operation
        • 8.4.1.9 Electrical installation requirements
        • 8.4.1.10 Handling and storage
        • 8.4.1.11 Commissioning and balancing
        • 8.4.1.12 Sequence of work
        • Figure reference tabl
      • 8.4.2 Mechanical extract ventilation systems (MEV)
        • 8.4.2.1 Compliance
        • 8.4.2.2 Provision of information
        • 8.4.2.3 System design
        • 8.4.2.4 Acoustics
        • 8.4.2.5 Building integration
        • 8.4.2.6 Ductwork
        • 8.4.2.7 Fixing and jointing of ductwork
        • 8.4.2.8 Access
        • 8.4.2.9 Electrical installation requirements
        • 8.4.2.10 Handling and storage
        • 8.4.2.11 Commissioning and balancing
        • 8.4.2.12 Sequence of work
        • Figure reference table
    • 8.5 LZC Hot water systems
      • 8.5.1 Solar thermal hot water systems
        • 8.5.1.1 Compliance
        • 8.5.1.2 Provision of information
        • 8.5.1.3 System design
        • 8.5.1.4 Safe discharge
        • 8.5.1.5 Building integration
        • 8.5.1.6 Fixing
        • 8.5.1.7 Access
        • 8.5.1.8 Electrical installation requirements
        • 8.5.1.9 Handling and storage
        • 8.5.1.10 Handover requirements
        • 8.5.1.11 Sequence of work
        • Figure reference table
    • 8.6 Installation and commissioning
      • 8.6.1 Compliance
      • 8.6.2 Installation
      • 8.6.3 Insulation to services
      • 8.6.4 Insulation performance
      • 8.6.5 Testing and commissioning
      • 8.6.6 Handover requirements
      • Figure reference table
  • 9 Finishes
    • 9.1 A consistent approach to finishes
      • 9.1.1 Compliance
      • 9.1.2 External walls
      • 9.1.3 Internal walls and ceilings
      • 9.1.4 Doors and windows
      • 9.1.5 Floors
      • 9.1.6 Glazing
      • 9.1.7 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.1.8 Fitted furniture
      • 9.1.9 Joint sealants
      • 9.1.10 Paint finishes
      • 9.1.11 Sanitary ware
      • 9.1.12 Other surfaces and components
      • 9.1.13 Pitched roof coverings
      • 9.1.14 Garages
      • 9.1.15 External works
      • 9.1.16 Further information
      • Figure reference table
    • 9.2 Wall and ceiling finishes
      • 9.2.1 Compliance
      • 9.2.2 Provision of information
      • 9.2.3 Plastering
      • 9.2.4 Dry lining
      • 9.2.5 Ceramic wall tiling
      • Figure reference table
    • 9.3 Floor finishes
      • 9.3.1 Compliance
      • 9.3.2 Provision of information
      • 9.3.3 Insulation
      • 9.3.4 Screed
      • 9.3.5 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.3.6 Wood finishes
      • 9.3.7 Flexible sheet and flexible tile finishes
      • 9.3.8 Asphalt finishes
      • 9.3.9 Staircase finishes
      • Figure reference table
    • 9.4 Finishes and fitments
      • 9.4.1 Compliance
      • 9.4.2 Provision of information
      • 9.4.3 General provisions – cupboards and fitments
      • 9.4.4 Finishings and internal trim
      • 9.4.5 Joinery
      • 9.4.6 Airing cupboards, cupboards, worktops and fitments
      • 9.4.7 Ironmongery, prefabricated items and other materials
      • 9.4.8 Protection and handover
      • Figure reference table
    • 9.5 Painting and decorating
      • 9.5.1 Compliance
      • 9.5.2 Provision of information
      • 9.5.3 Storage
      • 9.5.4 Conditions for painting and decorating
      • 9.5.5 Timber
      • 9.5.6 Steel
      • 9.5.7 Walls
      • 9.5.8 Wallpapering
      • 9.5.9 Other surfaces
      • 9.5.10 Completed painting and decorating
  • 10 External works
    • 10.1 Garages
      • 10.1.1 Compliance
      • 10.1.2 Provision of information
      • 10.1.3 Garage foundations
      • 10.1.4 Garage floors
      • 10.1.5 Garage walls
      • 10.1.6 Resistance to fire spread
      • 10.1.7 Security
      • 10.1.8 Doors and windows
      • 10.1.9 Garage roofs
      • 10.1.10 Permanent prefabricated garages and carports
      • 10.1.11 Services
      • Figure reference table
    • 10.2 Drives, paths and landscaping
      • 10.2.1 Compliance
      • 10.2.2 Provision of information
      • 10.2.3 Stability
      • 10.2.4 Freestanding walls and retaining structures
      • 10.2.5 Guarding and steps
      • 10.2.6 Drives, paths and landscaping
      • 10.2.7 Materials
      • 10.2.8 Garden areas within 3m of the home
      • 10.2.9 Garden areas
      • 10.2.10 External decking
      • 10.2.11 Landscaping
NHBC Hide Menu Show Menu

7.2 Pitched roofs

Also see:

BS 5534

7.2.19 Fixing tiles and slates

Coverings shall be suitably fixed to protect the building from weather. Issues to be taken into account include:

  1. eaves, ridge and hip tiles
  2. verges
  3. mortar
  4. mansard roofs and dormers.

Careful setting out will improve the finished appearance of the roof, help avoid problems such as unequal overhangs, and reduce excessive tile cutting at abutments, chimneys and similar obstructions.

When installing coverings:

  • clay tiles that do not meet the dimensional and geometric requirements given in BS EN 1304 should not be laid at pitches less than 40°
  • joints between tiles and slates should be slightly open, which provides some flexibility in setting out and should help to avoid tile cutting (single lap interlocking tiles have a tolerance of approximately 3mm at the joint)
  • double tiles, tile-and-a-half or half tiles can be used, when available from the manufacturer (to avoid the use of small sections of cut tiles). Alternatively, where the tile manufacturer provides guidance, small sections of single lap tile can be bonded to full tiles
  • the bottom edges of double-lapped slate and plain tile roofs should be finished with an under-eaves course.

Table 21: Pitch, gauge and lap

Type or tileGaugeMinimum headlapMinimum permissible pitch (°)
Plain (double lap)Maximum 1/3 length lap65mm generally for clay tiles
75mm in severe exposure conditions
35 (clay)
35 (plain concrete)
Concrete (single lap interlocking)Comply with the manufacturer’s recommendations75mm or to the manufacturer’s recommendations30⁽²⁾
Slates (double lap)Maximum 1/3 length lap54mm⁽¹⁾ minimum, increased with lower pitch and severe exposure conditions20 subject to headlap

Notes

1. For pitches greater than 45° and less than 75° in sheltered and moderate exposure zones only.
2. For pitches below 30°, evidence shall be provided as to suitable performance.

When fixing coverings to a pitched roof:

  • the fixing schedule should be produced by the tile manufacturer; fixings for single and double lap tiles should be in accordance with BS 5534 and BS EN 1994-1-4 (evidence of calculations in compliance with Technical Requirements R3 and R5 may be required)
  • coverings should be fixed in accordance with the design and the manufacturer’s recommendations
  • perimeter (see definitions) roof tiles or slates should be mechanically fixed using a minimum of two fixings (subject to meeting the wind loading recommendations), one of which can be a tile clip, adhesive (following manufacturers recommendations) or dry verge capping system where designed to resist uplift
  • slates and tiles should generally be fixed using clout or slate nails, these should be either silicon bronze, phosphor bronze, aluminium to BS 1202-3 or copper to BS 1202-2, additionally tiles can also be fixed using stainless steel clout nails
  • galvanized steel nails should not be used for slates and tiles
  • fixings should be a minimum of 38mm long, and penetrate a minimum of 15mm into battens
  • tile clips should be made of aluminium alloy or other alloy types, stainless steel, non-ferrous metals or polymer based materials and be of adequate durability and strength in accordance with BS 5534
  • slates should be fixed in accordance with BS 5534, fully nailed over the whole roof, and nailed twice where centre nailed. Alternatively slate hooks maybe used where they can be shown to resist wind uplift.

Where slate hooks are used they should:

  • meet the requirements of BS 5534
  • have a minimum shank diameter of 2.7mm
  • be stainless steel grade 316 to BS EN 10088-3
  • be ‘nail-in’ type slate hooks and not ‘hook-over’ batten type
  • have a crimped shank when used on roof pitches less than 30 degrees. Slate hooks should not be used on roof pitches below 25 degrees.

Where the hooked fixing method is used, slates at the perimeters of a roof eg eaves, valleys, verges, ridges, hips, abutments and penetrations, should be nailed (or nailed and hooked) to resist uplift and lateral drift.

Eaves, ridge and hip tiles#

At eaves:

  • tiles should project a minimum of 50mm across the gutter
  • when using natural or fibre cement slates or plain tiles, an under-eaves course should be used
  • the height of the facia should maintain the tile pitch, in accordance with the tile manufacturer’s recommendations.

Figure 62: Eaves detailing

Figure 62: Eaves detailing

Where ridge tiles are mortar bedded:

  • on duo-pitched roofs the underlay should be lapped over the ridge in accordance with Table 10
  • on mono-pitched roofs the underlay should extend over the mono ridge by a minimum 100mm
  • small openings above the top batten are permitted at ridges where required for ventilation of the roof void.

Figure 63: Mechanically fixed ridge

Figure 63: Mechanically fixed ridge

At hips:

  • underlay should continue to form a 150mm minimum lap parallel with the hip rafter
  • where wet bedded tiles are used, they should be supported at the base by a galvanized hip iron and project to the centre line of the gutter.

Ridge and hip tiles should be mechanically fixed with self-sealing non-ferrous fixings into timber battens, and have a nominal joint thickness of 10mm where wet bedded.

Wet bedded ‘baby’ hip/ridge tiles to low level roofs, such as those over porches and ground floor bay windows, may be bedded using mortar only, subject to self-weight being sufficient to resist the wind loads, in accordance with BS 5534 (Annex H). Where no wind uplift calculation is provided, baby hip/ridge tiles should be mechanically fixed, in accordance with manufacturer’s recommendations.

Where proprietary dry fixed, ridge and hip systems are used, they should conform to BS 8612 and be installed in accordance with manufacturers requirements.

Figure 64: Wet bedded ridge with dentil tiles

Figure 64: Wet bedded ridge with dentil tiles

Verges#

Where proprietary dry verge systems are used, they should conform to BS 8612 and be installed in accordance with manufacturers requirements.

Unless a proprietary dry verge system or cloaked verge is used, tiles should be bedded into a 100mm wide bed of mortar on an undercloak of fibre-cement board, plain tile or slate. Undercloaks should be a minimum 150mm wide and laid face down. Plain tiles should not be used as an undercloak below 30°pitch or on a bargeboard.

Undercloak should be:

  • fixed in accordance with manufacturer’s recommendations
  • installed to a true line
  • installed at the correct level to ensure that the line of the tiling is maintained where it passes over the wall, and not tilt inwards
  • bedded on roofing mortar and struck off flush with the external surface of the wall (alternatively, a suitable exterior grade bedding sealant should be used in accordance with the manufacturer’s recommendations)
  • securely nailed to a true line where a bargeboard is used.

Figure 65: Wet verge

Figure 65: Wet verge

Where verge tiles and slates are wet bedded, pointing should be completed as soon as possible using the same mix.

Verge clips should be in full contact with the tile to resist uplift, nailed twice to battens and sized to ensure that they are in direct contact with the top surface of the verge tile.

Where plain tiles and slates are used at the verge:

  • they should project 38-50mm beyond the gable wall or bargeboard
  • cut plain tiles are not acceptable, and purpose-made plain tile-and-a-half tiles should be used, see Figure 66
  • natural slate verges should be formed with full slates and either slate-and-a-half or half slates that are a minimum of 150mm wide.

Figure 66: Verge - plain tiles

Figure 66: Verge - plain tiles

Where interlocking tiles are used at the verge:

  • they should project 30-60mm beyond the gable wall or bargeboard
  • small sections (less than a half tile width) of cut interlocking tiles should be avoided. Where cut tiles (less than half a tile width) are used, these should be bonded to the adjacent tile in accordance with manufacturers recommendations.

Mortar#

When bedding tiles or slates in mortar:

  • the mortar should be 1:3 cement:sand with plasticiser
  • the mortar should be a mix based on sharp sand with soft sand added to achieve workability; the proportion of sharp sand should not be less than one third of the total sand content (proprietary mixes may be accepted by NHBC where they are shown to have similar strength, durability and workability)
  • pointing should be completed as soon as possible using the same mix
  • tiles should be wetted on their contact surface, and surface water allowed to drain away before fixing
  • concealed or decorative dentil tiles should be fully bedded into joints in excess of 25mm thick.

Tiling and slating to mansard roofs and dormers#

When fixing tiling and slating to mansard roofs (75° or steeper) and dormers:

  • all tiles and slates should be fixed in accordance with manufacturers requirements and BS 5534
  • tiles and slates should be fully nailed; single lap tiles require additional tail clips, double lap tiles (nibbed) require two nails, fibre cement slates require additional disc rivets, slates should be centre nailed
  • all tiling and slating should be laid over battens and counter battens, secured to the sheathing board in line with vertical supports
  • batten and counter batten sizes should be in accordance with this chapter
  • a suitable breather membrane/underlay should be provided in accordance with BS 5534
  • the length of the top course should ensure that the minimum headlap is maintained
  • the bottom edges (eave) should be finished with an under-course tile or slate, which extends a minimum 50mm below the tilting fillet
  • the eave course should be supported by a tilting fillet or other proprietary product which substantially maintains the same plane as the main cladding
  • at internal or external angles, purpose-made corner tiles or soakers should be used to form weathertight joints
  • where pitched roofs abuts a dormer, abutments should be formed in accordance with Clause 7.2.20 and BS 5534
  • at dormer cheeks, the tiles or slates should be specified to be cut close to the slope of the roof
  • where air impermeable outer weatherproof coverings eg fibre cement slates are used, ventilation behind the weatherproof covering should be in accordance with manufacturers requirements.

Vertical tiling and slating to walls should conform to Chapter 6.9 ‘Curtain walling and cladding’.

7.2.18 Roof coverings 7.2.20 Weathering details

Last updated: 8th February 2024

Back to top ⇧

NHBC Download

NHBC Standards 2024
Complete

NHBC Download

NHBC Standards 2024
Chapter 7

NHBC Standards 2024

Menu 3D Download Print Search Account Logout

Technical Disclaimer: The NHBC Standards are produced by NHBC as guidance solely for our builder customers as to how to interpret the technical requirements in relation to the warranty cover provided by NHBC under its Buildmark, Buildmark Choice, Buildmark Link, Buildmark Solo, Buildmark Connect or any similar product from time to time. It has not been created or intended for distribution or use outside of that purpose. The information contained in the NHBC Standards do not constitute advice and is not to be relied upon by any third party. Nothing in the NHBC Standards is intended to, nor should it be taken to, create any legal or contractual relationship. Any third party who chooses to rely upon the information contained in the NHBC Standards shall do so entirely at their own risk and NHBC accepts no duty of care or liability, however caused, in connection with its use or reliance by any third party.