NHBC
  • Home
  • 1 Welcome
    • 1.1 Contact us
    • 1.2 What’s changed
  • 2 Introduction
    • 2.1 The Standards and Technical Requirements
    • 2.2 3D Models
  • 3 General
    • 3.1 Concrete and its reinforcement
      • 3.1.1 Compliance
      • 3.1.2 Provision of information
      • 3.1.3 Storage of materials
      • 3.1.4 Site-mixed concrete
      • 3.1.5 Ready-mixed concrete
      • 3.1.6 Concrete specification
      • 3.1.7 Admixtures
      • 3.1.8 Special types of concrete
      • 3.1.9 Design of reinforced concrete
      • 3.1.10 Installation of reinforcement
      • 3.1.11 Blinding concrete
      • 3.1.12 Formwork
      • 3.1.13 Before concreting
      • 3.1.14 Casting
      • 3.1.15 Curing
      • 3.1.16 Testing
      • 3.1.17 Glossary
      • Figure reference table
    • 3.2 Cold weather working
      • 3.2.1 Compliance
      • 3.2.2 External conditions
      • 3.2.3 Materials
      • 3.2.4 Concreting
      • 3.2.5 Masonry
      • 3.2.6 Rendering, plastering and screeding
      • 3.2.7 Admixtures
      • 3.2.8 Painting
    • 3.3 Timber preservation (natural solid timber)
      • 3.3.1 Compliance
      • 3.3.2 Durability
      • 3.3.3 Sitework
      • 3.3.4 Protection and storage
      • 3.3.5 Treatment of cut surfaces
      • 3.3.6 Compatibility with metal
      • 3.3.7 Further information
      • Figure reference table
  • 4 Foundations
    • 4.1 Land quality – managing ground conditions
      • 4.1.1 Compliance
      • 4.1.2 Initial Assessment – desk study (all sites)
      • 4.1.3 Initial Assessment – walkover survey (all sites)
      • 4.1.4 Initial Assessment – results
      • 4.1.5 Basic Investigation (sites where hazards are not identified or suspected)
      • 4.1.6 Detailed Investigation (sites where hazards are identified or suspected)
      • 4.1.7 Managing the risks (sites where hazards are found)
      • 4.1.8 Unforeseen hazards
      • 4.1.9 Documentation and verification
      • 4.1.10 Guidance for investigations
      • 4.1.11 Further information
      • Figure reference table
    • 4.2 Building near trees
      • 4.2.1 Compliance
      • 4.2.2 Provision of information
      • 4.2.3 Building near trees
      • 4.2.4 The effects of trees on shrinkable soils
      • 4.2.5 Foundations in all soil types
      • 4.2.6 Excavation of foundations
      • 4.2.7 Foundations in shrinkable soils
      • 4.2.8 Design and construction of foundations in shrinkable soils
      • 4.2.9 Foundation depths for specific conditions in shrinkable soils
      • 4.2.10 Heave precautions
      • 4.2.11 New drainage
      • 4.2.12 Method of assessment of foundation depths using charts
      • 4.2.13 Method of assessment of foundation depths using tables
      • 4.2.14 Worked example
      • 4.2.15 Further information
    • 4.3 Strip and trench fill foundations
      • 4.3.1 Compliance
      • 4.3.2 Provision of information
      • 4.3.3 Ground conditions
      • 4.3.4 Hazardous ground
      • 4.3.5 Setting out
      • 4.3.6 Services and drainage
      • 4.3.7 Safe transmission of loads
      • 4.3.8 Sloping ground and stepped foundations
      • 4.3.9 Excavations
      • 4.3.10 Reinforcement
      • 4.3.11 Concrete
      • 4.3.12 Movement joints
      • 4.3.13 Construction joints
    • 4.4 Raft, pile, pier and beam foundations
      • 4.4.1 Compliance
      • 4.4.2 Provision of information
      • 4.4.3 Site conditions
      • 4.4.4 Hazardous ground
      • 4.4.5 Services and drainage
      • 4.4.6 Safe transmission of loads
      • 4.4.7 Construction
      • 4.4.8 Engineer checks
      • 4.4.9 Compressible materials
      • 4.4.10 Reinforcement
      • 4.4.11 Concrete
      • 4.4.12 Movement joints
      • 4.4.13 Resistance to moisture
    • 4.5 Vibratory ground improvement techniques
      • 4.5.1 Compliance
      • 4.5.2 Hazardous sites and ground hazards
      • 4.5.3 Desk study and site investigation
      • 4.5.4 Confirmation of suitability for treatment
      • 4.5.5 Suitability of ground conditions
      • 4.5.6 Compatibility of the ground, design and treatment
      • 4.5.7 Acceptable methods
      • 4.5.8 Materials for use as fill
      • 4.5.9 Granular material
      • 4.5.10 Sitework
      • 4.5.11 Adjacent excavations
      • 4.5.12 Verification of completed treatment
    • 4.6 Engineered fill
      • 4.6.1 Compliance
      • 4.6.2 Provision of information
      • 4.6.3 Hazardous sites and ground hazards
      • 4.6.4 Desk study and ground investigation
      • 4.6.5 Suitability of ground conditions
      • 4.6.6 Materials for use as engineered fill
      • 4.6.7 Design and specification of earthworks
      • 4.6.8 Compatibility of fill with foundations, infrastructure and external works
      • 4.6.9 Acceptable methods of earthworks filling
      • 4.6.10 Site work
      • 4.6.11 Adjacent excavations
      • 4.6.12 Verification of engineered fill
      • 4.6.13 Reporting
      • Figure reference table
  • 5 Substructure, Ground Floors, Drainage and Basements
    • 5.1 Substructure and ground-bearing floors
      • 5.1.1 Compliance
      • 5.1.2 Provision of information
      • 5.1.3 Transfer of loads
      • 5.1.4 Ground conditions
      • 5.1.5 Services and drainage
      • 5.1.6 Ground below fill
      • 5.1.7 Fill below floors
      • 5.1.8 Infill up to 600mm deep
      • 5.1.9 Materials used for fill
      • 5.1.10 Harmful or toxic materials
      • 5.1.11 Regulatory solutions
      • 5.1.12 Walls below the DPC
      • 5.1.13 Durability
      • 5.1.14 Mortar
      • 5.1.15 Wall ties
      • 5.1.16 Blinding
      • 5.1.17 Ground floor slab and concrete
      • 5.1.18 Laying the ground-bearing floor slab
      • 5.1.19 Damp proof course
      • 5.1.20 Damp proofing concrete floors
      • 5.1.21 Thermal insulation
      • 5.1.22 Installation of insulation
      • 5.1.23 Further information
      • Figure reference table
    • 5.2 Suspended ground floors
      • 5.2.1 Compliance
      • 5.2.2 Provision of information
      • 5.2.3 Contaminants
      • 5.2.4 Proprietary systems
      • 5.2.5 Transfer of loads: concrete floors
      • 5.2.6 Reinforced concrete
      • 5.2.7 Construction of suspended concrete ground floors
      • 5.2.8 Transfer of loads: timber floors
      • 5.2.9 Thermal insulation and thermal bridging
      • 5.2.10 Damp proofing and ventilation
      • 5.2.11 Floor finishes
      • 5.2.12 Floor decking
    • 5.3 Drainage below ground
      • 5.3.1 Compliance
      • 5.3.2 Provision of information
      • 5.3.3 Preliminary work
      • 5.3.4 Foul and surface water disposal
      • 5.3.5 Drainage system performance
      • 5.3.6 Ground water drainage
      • 5.3.7 Design to avoid damage and blockages
      • 5.3.8 Durability
      • 5.3.9 Septic tanks and cesspools
      • 5.3.10 Septic tank outputs
      • 5.3.11 Surface water soakaways
      • 5.3.12 Component requirements
      • 5.3.13 Excavation
      • 5.3.14 Protection of pipework
      • 5.3.15 Laying pipework
      • 5.3.16 Protection of work
      • 5.3.17 Testing
    • 5.4 Waterproofing of basements and other below ground structures
      • 5.4.1 Compliance
      • 5.4.2 Provision of information
      • 5.4.3 Waterproofing
      • 5.4.4 Ground conditions
      • 5.4.5 Structural stability
      • 5.4.6 Design considerations
      • 5.4.7 Waterproofing systems
      • 5.4.8 Handling, storage and protection
      • 5.4.9 Buried podiums
      • Figure reference table
  • 6 Superstructure (excluding roofs)
    • 6.1 External masonry walls
      • 6.1.1 Compliance
      • 6.1.2 Provision of information
      • 6.1.3 Structural design
      • 6.1.4 Fire resistance
      • 6.1.5 Acoustic resistance
      • 6.1.6 Exposure
      • 6.1.7 Thermal insulation
      • 6.1.8 Concrete blocks
      • 6.1.9 Bricks
      • 6.1.10 Stone masonry
      • 6.1.11 Construction of masonry walls
      • 6.1.12 Lintels
      • 6.1.13 Materials suitable for mortar
      • 6.1.14 Mortar
      • 6.1.15 Render
      • 6.1.16 Cladding
      • 6.1.17 DPCs and cavity trays
      • 6.1.18 Wall ties, bed joint reinforcements and windposts
      • 6.1.19 Handling materials
      • 6.1.20 Protection of the works during construction
      • Figure reference table
    • 6.2 External timber framed walls
      • 6.2.1 Compliance
      • 6.2.2 Provision of information
      • 6.2.3 Design checking and certification
      • 6.2.4 Load-bearing walls
      • 6.2.5 Fixing the frame
      • 6.2.6 Nails and staples
      • 6.2.7 Sheathing
      • 6.2.8 Differential movement
      • 6.2.9 Fire resistance
      • 6.2.10 Protection from moisture
      • 6.2.11 Timber preservation
      • 6.2.12 Air and vapour control layers
      • 6.2.13 Breather membranes
      • 6.2.14 Wall ties and fixings
      • 6.2.15 Insulation
      • Figure reference table
    • 6.3 Internal walls
      • 6.3.1 Compliance
      • 6.3.2 Provision of information
      • 6.3.3 Supporting load-bearing internal walls
      • 6.3.4 Masonry walls
      • 6.3.5 Load-bearing timber walls
      • 6.3.6 Fire resistance
      • 6.3.7 Sound insulation
      • 6.3.8 Partitions: internal non load-bearing
      • 6.3.9 Construction of timber partitions
      • 6.3.10 Construction of steel framed partitions
      • 6.3.11 Construction of proprietary systems
      • 6.3.12 Plasterboard
      • 6.3.13 Damp proof courses
      • 6.3.14 Components
      • Figure reference table
    • 6.4 Timber and concrete upper floors
      • 6.4.1 Compliance
      • 6.4.2 Provision of information
      • 6.4.3 Upper floor design
      • 6.4.4 Fire spread
      • 6.4.5 Sound insulation
      • 6.4.6 In-situ concrete floors and concreting
      • 6.4.7 Precast concrete
      • 6.4.8 Timber joist spans
      • 6.4.9 Timber joist performance
      • 6.4.10 Construction of timber floors
      • 6.4.11 Joists supported by intermediate walls
      • 6.4.12 Joists connected to steel
      • 6.4.13 Joists into hangers
      • 6.4.14 Timber joist and restraint strap
      • 6.4.15 Strutting
      • 6.4.16 Joists and openings
      • 6.4.17 Multiple joists
      • 6.4.18 Notching and drilling
      • 6.4.19 Floor decking
      • 6.4.20 Floating floors or floors between homes
    • 6.5 Steelwork
      • 6.5.1 Compliance
      • 6.5.2 Design guidance
      • 6.5.3 Steel grade and coatings
      • 6.5.4 Installation and support
      • 6.5.5 Padstones
      • 6.5.6 Connections
      • 6.5.7 Examples
      • Figure reference table
    • 6.6 Staircases
      • 6.6.1 Compliance
      • 6.6.2 Provision of information
      • 6.6.3 Fire precautions
      • 6.6.4 Lighting
      • 6.6.5 Glazing
      • 6.6.6 Structural design
      • 6.6.7 Headroom and width
      • 6.6.8 Design of steps
      • 6.6.9 Landings
      • 6.6.10 Guarding
      • 6.6.11 Handrails
      • 6.6.12 Staircases made from timber and wood-based products
      • 6.6.13 Concrete staircases
      • 6.6.14 Steel staircases
      • 6.6.15 Proprietary staircase units
      • 6.6.16 Protection
      • Figure reference table
    • 6.7 Doors, windows, and glazing
      • 6.7.1 Compliance
      • 6.7.2 Provision of information
      • 6.7.3 In-service performance
      • 6.7.4 Coupled door and window frame assemblies
      • 6.7.5 Glazing
      • 6.7.6 Security
      • 6.7.7 Timber doors and windows
      • 6.7.8 Non-timber doors and windows
      • 6.7.9 Ironmongery
      • 6.7.10 Material storage and protection
      • 6.7.11 Installation
      • 6.7.12 Completed work
      • Figure reference table
    • 6.8 Fireplaces, chimneys and flues
      • 6.8.1 Compliance
      • 6.8.2 Provision of information
      • 6.8.3 Solid fuel – fireplaces and hearths
      • 6.8.4 Solid fuel – combustion air
      • 6.8.5 Solid fuel – flue pipes
      • 6.8.6 Solid fuel – chimneys
      • 6.8.7 Solid fuel – outlets and terminals
      • 6.8.8 Gas – fireplaces and hearths
      • 6.8.9 Gas – combustion air
      • 6.8.10 Gas – flue pipes
      • 6.8.11 Gas – chimneys
      • 6.8.12 Gas – outlets and terminals
      • 6.8.13 Oil – fireplaces and hearths
      • 6.8.14 Oil – combustion air
      • 6.8.15 Oil – flue pipes
      • 6.8.16 Oil – chimneys
      • 6.8.17 Oil – outlets and terminals
      • 6.8.18 All – fireplaces and hearths
      • 6.8.19 All – fireplace surrounds
      • 6.8.20 All – flue pipes
      • 6.8.21 All – flue liners
      • 6.8.22 All – flues
      • 6.8.23 All – chimneys
      • 6.8.24 Masonry
      • 6.8.25 Mortar
      • 6.8.26 DPC
      • 6.8.27 Flashings
      • 6.8.28 Terminals
      • 6.8.29 Flue testing
      • 6.8.30 Further information
    • 6.9 Curtain walling and cladding
      • 6.9.1 Compliance
      • 6.9.2 Provision of information
      • 6.9.3 Certification
      • 6.9.4 Loads
      • 6.9.5 Support and fixings
      • 6.9.6 Durability
      • 6.9.7 Interfaces
      • 6.9.8 Insulation
      • 6.9.9 Damp proofing and vapour control
      • 6.9.10 Installation and tolerances
      • 6.9.11 Electrical continuity and earth bonding
      • 6.9.12 Maintenance
      • 6.9.13 Glazing, gaskets and sealants
      • 6.9.14 Cavity barriers and firestops
      • 6.9.15 Ventilation screens
      • 6.9.16 Handling and storage
      • 6.9.17 Curtain walling
      • 6.9.18 Rainscreen cladding
      • 6.9.19 Insulated render and brick slip cladding
    • 6.10 Light steel framed walls and floors
      • 6.10.1 Compliance
      • 6.10.2 Provision of information
      • 6.10.3 Structural certification
      • 6.10.4 Structural design of load-bearing floors and walls
      • 6.10.5 Structural design of infill walls
      • 6.10.6 Roofs
      • 6.10.7 Steel and fixings
      • 6.10.8 Detailing of steel joists
      • 6.10.9 Restraint
      • 6.10.10 Construction of load-bearing walls and external infill walls
      • 6.10.11 Interfaces with staircases
      • 6.10.12 Fixing floor decking and ceilings
      • 6.10.13 Other design issues
      • 6.10.14 Behaviour in relation to fire
      • 6.10.15 Acoustic performance
      • 6.10.16 Moisture control
      • 6.10.17 Insulation
      • 6.10.18 Air and vapour control layers
      • 6.10.19 Breather membranes
      • 6.10.20 Cladding, lining and sheathing boards
      • 6.10.21 Wall ties
      • 6.10.22 Services
      • 6.10.23 Further information
      • Figure reference table
    • 6.11 Render
      • 6.11.1 Compliance
      • 6.11.2 Provision of information
      • 6.11.3 Weather conditions
      • 6.11.4 Backgrounds
      • 6.11.5 Accommodation of movement
      • 6.11.6 Mixes
      • 6.11.7 Detailing
      • 6.11.8 Render onto board backgrounds
      • 6.11.9 Finishes
      • Figure reference table
  • 7 Roofs
    • 7.1 Flat roofs, terraces and balconies
      • 7.1.1 Compliance
      • 7.1.2 Provision of information
      • 7.1.3 Flat roof, terrace and balcony general design
      • 7.1.4 Drainage
      • 7.1.5 Flat roof, terrace and balcony structural design
      • 7.1.6 Timber structure and deck
      • 7.1.7 Concrete decks
      • 7.1.8 Profiled self-supporting metal roof decks
      • 7.1.9 Profiled self-supporting metal roofing
      • 7.1.10 Thermal insulation and vapour control
      • 7.1.11 Waterproofing layer and surface treatments
      • 7.1.12 Green and biodiverse (brown roofs) – including roof gardens
      • 7.1.13 Blue roofs
      • 7.1.14 Raised and buried podiums
      • 7.1.15 Detailing of flat roofs
      • 7.1.16 Accessible thresholds and upstands
      • 7.1.17 Metal balcony decking systems
      • 7.1.18 Parapets and guarding to terraces and balconies
    • 7.2 Pitched roofs
      • 7.2.1 Compliance
      • 7.2.2 Provision of information
      • 7.2.3 Design of pitched roofs
      • 7.2.4 Protection of trusses
      • 7.2.5 Durability
      • 7.2.6 Wall plates
      • 7.2.7 Joints and connections
      • 7.2.8 Restraint
      • 7.2.9 Bracing for trussed rafter roofs
      • 7.2.10 Strutting for site formed attic trusses and cut roofs that form a floor
      • 7.2.11 Support for equipment
      • 7.2.12 Access
      • 7.2.13 Dormer construction
      • 7.2.14 Underlay, sarking boards and sheets
      • 7.2.15 Ventilation, vapour control and insulation
      • 7.2.16 Fire-stopping and cavity barriers
      • 7.2.17 Battens
      • 7.2.18 Roof coverings
      • 7.2.19 Fixing tiles and slates
      • 7.2.20 Weathering details
      • 7.2.21 Valleys and hidden gutters
      • 7.2.22 Drainage
      • 7.2.23 Fascias and trim
      • 7.2.24 Spandrel panels in cold roofs
      • 7.2.25 Roof cassette systems
      • 7.2.26 Solar roof panels
      • Figure reference table
  • 8 Services
    • 8.1 Internal services
      • 8.1.1 Compliance
      • 8.1.2 Provision of information
      • 8.1.3 Water services and supply
      • 8.1.4 Cold water storage
      • 8.1.5 Gas services
      • 8.1.6 Electrical services
      • 8.1.7 Meter boxes
      • 8.1.8 Hot water services
      • 8.1.9 Unvented storage systems
      • 8.1.10 Soil and waste systems internal
      • Figure reference table
    • 8.2 Electrical generating technologies
      • 8.2.1 Solar photovoltaics (PV)
        • 8.2.1.1 Compliance
        • 8.2.1.2 Provision of information
        • 8.2.1.3 System design
        • 8.2.1.4 Building integration
        • 8.2.1.5 Fixing
        • 8.2.1.6 Access
        • 8.2.1.7 Electrical installation requirements
        • 8.2.1.8 Handling and storage
        • 8.2.1.9 Sequence of work
        • Figure reference table
      • 8.2.2 Wind turbines
        • 8.2.2.1 Compliance
        • 8.2.2.2 Provision of information
        • 8.2.2.3 System design
        • 8.2.2.4 Building integration
        • 8.2.2.5 Fixing
        • 8.2.2.6 Access
        • 8.2.2.7 Electrical installation requirements
        • 8.2.2.8 Handling and storage
        • 8.2.2.9 Sequence of work
        • Figure reference table
    • 8.3 Space heating systems
      • 8.3.1 Space heating
        • 8.3.1.1 Requirements
      • 8.3.2 Gas heating appliances
        • 8.3.2.1 Compliance
        • 8.3.2.2 Provision of information
        • 8.3.2.3 System design
        • 8.3.2.4 Building integration
        • 8.3.2.5 Fixing
        • 8.3.2.6 Access
        • 8.3.2.7 Electrical installation requirements
        • 8.3.2.8 Handling and storage
        • 8.3.2.9 Sequence of work
      • 8.3.3 Heat pumps
        • 8.3.3.1 Compliance
        • 8.3.3.2 Provision of information
        • 8.3.3.3 System design
        • 8.3.3.4 Pipes, insulation and protection from cold
        • 8.3.3.5 Ground collectors
        • 8.3.3.6 Building integration
        • 8.3.3.7 Fixing
        • 8.3.3.8 Access
        • 8.3.3.9 Electrical installation requirements
        • 8.3.3.10 Handling and storage
        • 8.3.3.11 Sequence of work
        • Figure reference table
      • 8.3.4 Biomass
        • 8.3.4.1 Compliance
        • 8.3.4.2 Clean air act
        • 8.3.4.3 Fuel storage
        • Figure reference table
    • 8.4 Ventilation
      • 8.4.1 Mechanical ventilation and heat recovery (MVHR)
        • 8.4.1.1 Compliance
        • 8.4.1.2 Provision of information
        • 8.4.1.3 System design
        • 8.4.1.4 Acoustics
        • 8.4.1.5 Building integration
        • 8.4.1.6 Ductwork
        • 8.4.1.7 Fixing and jointing of ductwork
        • 8.4.1.8 Access and operation
        • 8.4.1.9 Electrical installation requirements
        • 8.4.1.10 Handling and storage
        • 8.4.1.11 Commissioning and balancing
        • 8.4.1.12 Sequence of work
        • Figure reference tabl
      • 8.4.2 Mechanical extract ventilation systems (MEV)
        • 8.4.2.1 Compliance
        • 8.4.2.2 Provision of information
        • 8.4.2.3 System design
        • 8.4.2.4 Acoustics
        • 8.4.2.5 Building integration
        • 8.4.2.6 Ductwork
        • 8.4.2.7 Fixing and jointing of ductwork
        • 8.4.2.8 Access
        • 8.4.2.9 Electrical installation requirements
        • 8.4.2.10 Handling and storage
        • 8.4.2.11 Commissioning and balancing
        • 8.4.2.12 Sequence of work
        • Figure reference table
    • 8.5 LZC Hot water systems
      • 8.5.1 Solar thermal hot water systems
        • 8.5.1.1 Compliance
        • 8.5.1.2 Provision of information
        • 8.5.1.3 System design
        • 8.5.1.4 Safe discharge
        • 8.5.1.5 Building integration
        • 8.5.1.6 Fixing
        • 8.5.1.7 Access
        • 8.5.1.8 Electrical installation requirements
        • 8.5.1.9 Handling and storage
        • 8.5.1.10 Handover requirements
        • 8.5.1.11 Sequence of work
        • Figure reference table
    • 8.6 Installation and commissioning
      • 8.6.1 Compliance
      • 8.6.2 Installation
      • 8.6.3 Insulation to services
      • 8.6.4 Insulation performance
      • 8.6.5 Testing and commissioning
      • 8.6.6 Handover requirements
      • Figure reference table
  • 9 Finishes
    • 9.1 A consistent approach to finishes
      • 9.1.1 Compliance
      • 9.1.2 External walls
      • 9.1.3 Internal walls and ceilings
      • 9.1.4 Doors and windows
      • 9.1.5 Floors
      • 9.1.6 Glazing
      • 9.1.7 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.1.8 Fitted furniture
      • 9.1.9 Joint sealants
      • 9.1.10 Paint finishes
      • 9.1.11 Sanitary ware
      • 9.1.12 Other surfaces and components
      • 9.1.13 Pitched roof coverings
      • 9.1.14 Garages
      • 9.1.15 External works
      • 9.1.16 Further information
      • Figure reference table
    • 9.2 Wall and ceiling finishes
      • 9.2.1 Compliance
      • 9.2.2 Provision of information
      • 9.2.3 Plastering
      • 9.2.4 Dry lining
      • 9.2.5 Ceramic wall tiling
      • Figure reference table
    • 9.3 Floor finishes
      • 9.3.1 Compliance
      • 9.3.2 Provision of information
      • 9.3.3 Insulation
      • 9.3.4 Screed
      • 9.3.5 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.3.6 Wood finishes
      • 9.3.7 Flexible sheet and flexible tile finishes
      • 9.3.8 Asphalt finishes
      • 9.3.9 Staircase finishes
      • Figure reference table
    • 9.4 Finishes and fitments
      • 9.4.1 Compliance
      • 9.4.2 Provision of information
      • 9.4.3 General provisions – cupboards and fitments
      • 9.4.4 Finishings and internal trim
      • 9.4.5 Joinery
      • 9.4.6 Airing cupboards, cupboards, worktops and fitments
      • 9.4.7 Ironmongery, prefabricated items and other materials
      • 9.4.8 Protection and handover
      • Figure reference table
    • 9.5 Painting and decorating
      • 9.5.1 Compliance
      • 9.5.2 Provision of information
      • 9.5.3 Storage
      • 9.5.4 Conditions for painting and decorating
      • 9.5.5 Timber
      • 9.5.6 Steel
      • 9.5.7 Walls
      • 9.5.8 Wallpapering
      • 9.5.9 Other surfaces
      • 9.5.10 Completed painting and decorating
  • 10 External works
    • 10.1 Garages
      • 10.1.1 Compliance
      • 10.1.2 Provision of information
      • 10.1.3 Garage foundations
      • 10.1.4 Garage floors
      • 10.1.5 Garage walls
      • 10.1.6 Resistance to fire spread
      • 10.1.7 Security
      • 10.1.8 Doors and windows
      • 10.1.9 Garage roofs
      • 10.1.10 Permanent prefabricated garages and carports
      • 10.1.11 Services
      • Figure reference table
    • 10.2 Drives, paths and landscaping
      • 10.2.1 Compliance
      • 10.2.2 Provision of information
      • 10.2.3 Stability
      • 10.2.4 Freestanding walls and retaining structures
      • 10.2.5 Guarding and steps
      • 10.2.6 Drives, paths and landscaping
      • 10.2.7 Materials
      • 10.2.8 Garden areas within 3m of the home
      • 10.2.9 Garden areas
      • 10.2.10 External decking
      • 10.2.11 Landscaping
NHBC Hide Menu Show Menu

6.10 Light steel framed walls and floors

6.10.4 Structural design of load-bearing floors and walls

LSF floors and walls shall be designed to support and transfer loads safely and without undue movement. Issues to be taken into account include:

  1. structural floors
  2. structural walls
  3. overall stability.

Structural floors#

Floors should:

  • be of the correct type
  • be fitted in the specified location
  • have suitably sized trimmers around floor openings
  • have a typical maximum joist spacing of 600mm, although greater spacings may be applied when designed by an engineer in accordance with Technical Requirement R5 or covered by an SCI system-specific Stage 1 assessment with the project-specific application reviewed and checked by an NHBC registered LSF certifier.

Light steel joists should be fixed to supporting walls by either:

  • web cleats
  • ‘Z’ or ‘L’ hangers
  • a track connection
  • direct attachment to wall studs, or
  • bearing onto the supporting structure (bearing stiffeners may be required).

Joist support cleats should:

  • be of the correct type
  • be fitted in the specified location
  • use fixings as specified in the design.

Where required, web stiffeners should be properly fitted.

Where joists are fitted directly to light steel wall studs, pre-drilled holes should be correctly aligned before making the final connection.

Fixing holes should not be enlarged, and additional holes should not be cut without prior approval of the designer.

Figure 1: Joist bearing onto structure with stiffener

Figure 1: Joist bearing onto structure with stiffener

Figure 2: Web cleat connection

Figure 2: Web cleat connection

Figure 3: Bolted web to web connection

Figure 3: Bolted web to web connection

Static criteria for the maximum permissible deflection of a single joist due to:

  • imposed load, limited to (span/450)
  • dead and imposed loads, limited to the lesser of (span/350) or 15mm.

Dynamic criteria:

  • the natural frequency of the floor should not be less than 8Hz for dead load plus 0.2 x imposed load; this can be achieved by limiting the deflection of a single joist to 5mm for the given loading
  • the deflection of the floor (ie, a series of joists plus the floor decking) when subject to a 1kN point load should be limited to the values in Table 2.

Table 2: Deflection with point loads of 1kN

Span (m)Maximum deflection (mm)
3.51.7
3.81.6
4.21.5
4.61.4
5.31.3
6.21.2

The deflection of a single joist is dependent on the:

  • overall floor construction
  • number of effective joists that are deemed to share the applied 1kN point load (typical values are given in Table 3).

Table 3: Typical values

NHBC technical illustration

Light steel ground floor construction

Provision should be made to prevent ground moisture affecting light steel floors. This can be achieved by covering the ground below the floor with either:

  • 50mm oversite concrete or 50mm fine aggregate on 1200 gauge (0.3mm thick) polyethylene membrane laid on 50mm sand blinding, or
  • 100mm oversite concrete on a compacted clean, inert hardcore bed. Where necessary, this concrete should be protected against sulfate attack by the use of a lapped polyethylene DPM, not less than 1200 gauge (0.3mm thick) or 1000 gauge where assessed in accordance with Technical Requirement R3.

Floors should have a 150mm minimum void below the floor which is ventilated by:

  • openings on at least two opposite sides
  • 1500mm2 per metre run of external wall or 500mm2 per m2 of floor area (whichever provides the largest area).

Where there is shrinkable soil, heave can occur. The minimum underfloor void ventilation requirement should be increased as follows:

  • high potential – 150mm (300mm total)
  • medium potential – 100mm (250mm total)
  • low potential – 50mm (200mm total).

See Chapter 4.2 ‘Building near trees’ for definitions of high, medium and low volume change potential.

For concrete ground floors refer to Chapters 5.1 ‘Substructure and ground-bearing floors’ and 5.2 ‘Suspended ground floors’.

Concrete upper floors

Concrete floors may be used with LSF and may be constructed using either thin precast units or in-situ concrete placed on steel decking. The deflection of simply supported composite floors should be limited to take account of the long-term effects of creep and shrinkage. Composite floors should be appropriately propped until the concrete reaches the required strength and should not be overloaded during construction. Guidance can be found in Section 6.3 of SCI publication P402 ‘Light steel framing in residential construction’.

Structural walls#

The structural design of the building should ensure adequate resistance to loadings including dead loads, imposed loads, wind loads and snow loads, in accordance with:

  • BS EN 1991-1-1
  • BS EN 1991-1-3
  • BS EN 1991-1-4.

Further guidance on deflection limits can be found in SCI guidance P402 ‘Light steel framing in residential construction’.

Individual studs should generally:

  • be sized to meet structural requirements, allowing for board fixings at joints and construction tolerances
  • have a maximum spacing of 600mm
  • consider deflection if not designed to carry vertical loading from the primary structure.

Alternative stud arrangements should be agreed with NHBC.

Lintels, including trussed lintels, should be:

  • provided to any opening in load-bearing panels where one or more studs is cut or displaced to form the opening, but are not required where an opening falls between studs
  • securely fixed to supporting studs to ensure that loads are fully transferred.

At openings, additional studs may be required to provide support or fixing points for wall ties, cladding and wall linings.

Multiple studs should be included to support multiple joists, unless otherwise specified by the designer.

Figure 4: Lintel arrangement

Figure 4: Lintel arrangement

Where panels are diagonally braced with a flat strip, the brace should be fixed to each stud at the intersection to minimise bowing in the bracing member. Alternatively, bracing may be tensioned using alternative methods where included in the scope of the Stage 1 certification.

Appropriate holding-down devices should be provided to resist uplift, where necessary. The anchorage for holding-down devices should have sufficient mass to resist the uplift forces (See Clause 6.10.10).

Where roof trusses sit directly on a top track, the design should consider all loads, such as:

  • wind uplift
  • lateral support
  • vertical loading (assuming that trusses may be offset from studs).

Where included in the design, timber wall plates should be:

  • fixed to the head rail of wall panels onto which timber roof trusses bear
  • sized (including the head rail) to permit single timber trusses to be positioned at any point between studs.

Allowance for movement, including at openings and penetrations, should:

  • prevent load transfer onto services or flues
  • consider elastic shortening of the LSF and movement potential of any panels, cladding or boards
  • be fully coordinated with the whole building design.

Overall stability#

Methods to provide overall stability should either:

  • be designed to BS EN 1993-1-1, or
  • be tested to BS EN 594.

Wall panels may provide stability using one or more of the following techniques:

  • internal bracing
  • crossed flat bracing
  • external sheathing board in accordance with Clause 6.10.20
  • rigid frame action.

Internal lining boards can be used where demonstrated to be suitable for the purpose.

6.10.3 Structural certification 6.10.5 Structural design of infill walls

Last updated: 2nd January 2024

Back to top ⇧

NHBC Download

NHBC Standards 2024
Complete

NHBC Download

NHBC Standards 2024
Chapter 6

NHBC Standards 2024

Menu 3D Download Print Search Account Logout

Technical Disclaimer: The NHBC Standards are produced by NHBC as guidance solely for our builder customers as to how to interpret the technical requirements in relation to the warranty cover provided by NHBC under its Buildmark, Buildmark Choice, Buildmark Link, Buildmark Solo, Buildmark Connect or any similar product from time to time. It has not been created or intended for distribution or use outside of that purpose. The information contained in the NHBC Standards do not constitute advice and is not to be relied upon by any third party. Nothing in the NHBC Standards is intended to, nor should it be taken to, create any legal or contractual relationship. Any third party who chooses to rely upon the information contained in the NHBC Standards shall do so entirely at their own risk and NHBC accepts no duty of care or liability, however caused, in connection with its use or reliance by any third party.