NHBC
  • Home
  • 1 Welcome
    • 1.1 Contact us
    • 1.2 What’s changed
  • 2 Introduction
    • 2.1 The Standards and Technical Requirements
    • 2.2 3D Models
  • 3 General
    • 3.1 Concrete and its reinforcement
      • 3.1.1 Compliance
      • 3.1.2 Provision of information
      • 3.1.3 Storage of materials
      • 3.1.4 Site-mixed concrete
      • 3.1.5 Ready-mixed concrete
      • 3.1.6 Concrete specification
      • 3.1.7 Admixtures
      • 3.1.8 Special types of concrete
      • 3.1.9 Design of reinforced concrete
      • 3.1.10 Installation of reinforcement
      • 3.1.11 Blinding concrete
      • 3.1.12 Formwork
      • 3.1.13 Before concreting
      • 3.1.14 Casting
      • 3.1.15 Curing
      • 3.1.16 Testing
      • 3.1.17 Glossary
      • Figure reference table
    • 3.2 Cold weather working
      • 3.2.1 Compliance
      • 3.2.2 External conditions
      • 3.2.3 Materials
      • 3.2.4 Concreting
      • 3.2.5 Masonry
      • 3.2.6 Rendering, plastering and screeding
      • 3.2.7 Admixtures
      • 3.2.8 Painting
    • 3.3 Timber preservation (natural solid timber)
      • 3.3.1 Compliance
      • 3.3.2 Durability
      • 3.3.3 Sitework
      • 3.3.4 Protection and storage
      • 3.3.5 Treatment of cut surfaces
      • 3.3.6 Compatibility with metal
      • 3.3.7 Further information
      • Figure reference table
  • 4 Foundations
    • 4.1 Land quality – managing ground conditions
      • 4.1.1 Compliance
      • 4.1.2 Initial Assessment – desk study (all sites)
      • 4.1.3 Initial Assessment – walkover survey (all sites)
      • 4.1.4 Initial Assessment – results
      • 4.1.5 Basic Investigation (sites where hazards are not identified or suspected)
      • 4.1.6 Detailed Investigation (sites where hazards are identified or suspected)
      • 4.1.7 Managing the risks (sites where hazards are found)
      • 4.1.8 Unforeseen hazards
      • 4.1.9 Documentation and verification
      • 4.1.10 Guidance for investigations
      • 4.1.11 Further information
      • Figure reference table
    • 4.2 Building near trees
      • 4.2.1 Compliance
      • 4.2.2 Provision of information
      • 4.2.3 Building near trees
      • 4.2.4 The effects of trees on shrinkable soils
      • 4.2.5 Foundations in all soil types
      • 4.2.6 Excavation of foundations
      • 4.2.7 Foundations in shrinkable soils
      • 4.2.8 Design and construction of foundations in shrinkable soils
      • 4.2.9 Foundation depths for specific conditions in shrinkable soils
      • 4.2.10 Heave precautions
      • 4.2.11 New drainage
      • 4.2.12 Method of assessment of foundation depths using charts
      • 4.2.13 Method of assessment of foundation depths using tables
      • 4.2.14 Worked example
      • 4.2.15 Further information
    • 4.3 Strip and trench fill foundations
      • 4.3.1 Compliance
      • 4.3.2 Provision of information
      • 4.3.3 Ground conditions
      • 4.3.4 Hazardous ground
      • 4.3.5 Setting out
      • 4.3.6 Services and drainage
      • 4.3.7 Safe transmission of loads
      • 4.3.8 Sloping ground and stepped foundations
      • 4.3.9 Excavations
      • 4.3.10 Reinforcement
      • 4.3.11 Concrete
      • 4.3.12 Movement joints
      • 4.3.13 Construction joints
    • 4.4 Raft, pile, pier and beam foundations
      • 4.4.1 Compliance
      • 4.4.2 Provision of information
      • 4.4.3 Site conditions
      • 4.4.4 Hazardous ground
      • 4.4.5 Services and drainage
      • 4.4.6 Safe transmission of loads
      • 4.4.7 Construction
      • 4.4.8 Engineer checks
      • 4.4.9 Compressible materials
      • 4.4.10 Reinforcement
      • 4.4.11 Concrete
      • 4.4.12 Movement joints
      • 4.4.13 Resistance to moisture
    • 4.5 Vibratory ground improvement techniques
      • 4.5.1 Compliance
      • 4.5.2 Hazardous sites and ground hazards
      • 4.5.3 Desk study and site investigation
      • 4.5.4 Confirmation of suitability for treatment
      • 4.5.5 Suitability of ground conditions
      • 4.5.6 Compatibility of the ground, design and treatment
      • 4.5.7 Acceptable methods
      • 4.5.8 Materials for use as fill
      • 4.5.9 Granular material
      • 4.5.10 Sitework
      • 4.5.11 Adjacent excavations
      • 4.5.12 Verification of completed treatment
    • 4.6 Engineered fill
      • 4.6.1 Compliance
      • 4.6.2 Provision of information
      • 4.6.3 Hazardous sites and ground hazards
      • 4.6.4 Desk study and ground investigation
      • 4.6.5 Suitability of ground conditions
      • 4.6.6 Materials for use as engineered fill
      • 4.6.7 Design and specification of earthworks
      • 4.6.8 Compatibility of fill with foundations, infrastructure and external works
      • 4.6.9 Acceptable methods of earthworks filling
      • 4.6.10 Site work
      • 4.6.11 Adjacent excavations
      • 4.6.12 Verification of engineered fill
      • 4.6.13 Reporting
      • Figure reference table
  • 5 Substructure, Ground Floors, Drainage and Basements
    • 5.1 Substructure and ground-bearing floors
      • 5.1.1 Compliance
      • 5.1.2 Provision of information
      • 5.1.3 Transfer of loads
      • 5.1.4 Ground conditions
      • 5.1.5 Services and drainage
      • 5.1.6 Ground below fill
      • 5.1.7 Fill below floors
      • 5.1.8 Infill up to 600mm deep
      • 5.1.9 Materials used for fill
      • 5.1.10 Harmful or toxic materials
      • 5.1.11 Regulatory solutions
      • 5.1.12 Walls below the DPC
      • 5.1.13 Durability
      • 5.1.14 Mortar
      • 5.1.15 Wall ties
      • 5.1.16 Blinding
      • 5.1.17 Ground floor slab and concrete
      • 5.1.18 Laying the ground-bearing floor slab
      • 5.1.19 Damp proof course
      • 5.1.20 Damp proofing concrete floors
      • 5.1.21 Thermal insulation
      • 5.1.22 Installation of insulation
      • 5.1.23 Further information
      • Figure reference table
    • 5.2 Suspended ground floors
      • 5.2.1 Compliance
      • 5.2.2 Provision of information
      • 5.2.3 Contaminants
      • 5.2.4 Proprietary systems
      • 5.2.5 Transfer of loads: concrete floors
      • 5.2.6 Reinforced concrete
      • 5.2.7 Construction of suspended concrete ground floors
      • 5.2.8 Transfer of loads: timber floors
      • 5.2.9 Thermal insulation and thermal bridging
      • 5.2.10 Damp proofing and ventilation
      • 5.2.11 Floor finishes
      • 5.2.12 Floor decking
    • 5.3 Drainage below ground
      • 5.3.1 Compliance
      • 5.3.2 Provision of information
      • 5.3.3 Preliminary work
      • 5.3.4 Foul and surface water disposal
      • 5.3.5 Drainage system performance
      • 5.3.6 Ground water drainage
      • 5.3.7 Design to avoid damage and blockages
      • 5.3.8 Durability
      • 5.3.9 Septic tanks and cesspools
      • 5.3.10 Septic tank outputs
      • 5.3.11 Surface water soakaways
      • 5.3.12 Component requirements
      • 5.3.13 Excavation
      • 5.3.14 Protection of pipework
      • 5.3.15 Laying pipework
      • 5.3.16 Protection of work
      • 5.3.17 Testing
    • 5.4 Waterproofing of basements and other below ground structures
      • 5.4.1 Compliance
      • 5.4.2 Provision of information
      • 5.4.3 Waterproofing
      • 5.4.4 Ground conditions
      • 5.4.5 Structural stability
      • 5.4.6 Design considerations
      • 5.4.7 Waterproofing systems
      • 5.4.8 Handling, storage and protection
      • 5.4.9 Buried podiums
      • Figure reference table
  • 6 Superstructure (excluding roofs)
    • 6.1 External masonry walls
      • 6.1.1 Compliance
      • 6.1.2 Provision of information
      • 6.1.3 Structural design
      • 6.1.4 Fire resistance
      • 6.1.5 Acoustic resistance
      • 6.1.6 Exposure
      • 6.1.7 Thermal insulation
      • 6.1.8 Concrete blocks
      • 6.1.9 Bricks
      • 6.1.10 Stone masonry
      • 6.1.11 Construction of masonry walls
      • 6.1.12 Lintels
      • 6.1.13 Materials suitable for mortar
      • 6.1.14 Mortar
      • 6.1.15 Render
      • 6.1.16 Cladding
      • 6.1.17 DPCs and cavity trays
      • 6.1.18 Wall ties, bed joint reinforcements and windposts
      • 6.1.19 Handling materials
      • 6.1.20 Protection of the works during construction
      • Figure reference table
    • 6.2 External timber framed walls
      • 6.2.1 Compliance
      • 6.2.2 Provision of information
      • 6.2.3 Design checking and certification
      • 6.2.4 Load-bearing walls
      • 6.2.5 Fixing the frame
      • 6.2.6 Nails and staples
      • 6.2.7 Sheathing
      • 6.2.8 Differential movement
      • 6.2.9 Fire resistance
      • 6.2.10 Protection from moisture
      • 6.2.11 Timber preservation
      • 6.2.12 Air and vapour control layers
      • 6.2.13 Breather membranes
      • 6.2.14 Wall ties and fixings
      • 6.2.15 Insulation
      • Figure reference table
    • 6.3 Internal walls
      • 6.3.1 Compliance
      • 6.3.2 Provision of information
      • 6.3.3 Supporting load-bearing internal walls
      • 6.3.4 Masonry walls
      • 6.3.5 Load-bearing timber walls
      • 6.3.6 Fire resistance
      • 6.3.7 Sound insulation
      • 6.3.8 Partitions: internal non load-bearing
      • 6.3.9 Construction of timber partitions
      • 6.3.10 Construction of steel framed partitions
      • 6.3.11 Construction of proprietary systems
      • 6.3.12 Plasterboard
      • 6.3.13 Damp proof courses
      • 6.3.14 Components
      • Figure reference table
    • 6.4 Timber and concrete upper floors
      • 6.4.1 Compliance
      • 6.4.2 Provision of information
      • 6.4.3 Upper floor design
      • 6.4.4 Fire spread
      • 6.4.5 Sound insulation
      • 6.4.6 In-situ concrete floors and concreting
      • 6.4.7 Precast concrete
      • 6.4.8 Timber joist spans
      • 6.4.9 Timber joist performance
      • 6.4.10 Construction of timber floors
      • 6.4.11 Joists supported by intermediate walls
      • 6.4.12 Joists connected to steel
      • 6.4.13 Joists into hangers
      • 6.4.14 Timber joist and restraint strap
      • 6.4.15 Strutting
      • 6.4.16 Joists and openings
      • 6.4.17 Multiple joists
      • 6.4.18 Notching and drilling
      • 6.4.19 Floor decking
      • 6.4.20 Floating floors or floors between homes
    • 6.5 Steelwork
      • 6.5.1 Compliance
      • 6.5.2 Design guidance
      • 6.5.3 Steel grade and coatings
      • 6.5.4 Installation and support
      • 6.5.5 Padstones
      • 6.5.6 Connections
      • 6.5.7 Examples
      • Figure reference table
    • 6.6 Staircases
      • 6.6.1 Compliance
      • 6.6.2 Provision of information
      • 6.6.3 Fire precautions
      • 6.6.4 Lighting
      • 6.6.5 Glazing
      • 6.6.6 Structural design
      • 6.6.7 Headroom and width
      • 6.6.8 Design of steps
      • 6.6.9 Landings
      • 6.6.10 Guarding
      • 6.6.11 Handrails
      • 6.6.12 Staircases made from timber and wood-based products
      • 6.6.13 Concrete staircases
      • 6.6.14 Steel staircases
      • 6.6.15 Proprietary staircase units
      • 6.6.16 Protection
      • Figure reference table
    • 6.7 Doors, windows, and glazing
      • 6.7.1 Compliance
      • 6.7.2 Provision of information
      • 6.7.3 In-service performance
      • 6.7.4 Coupled door and window frame assemblies
      • 6.7.5 Glazing
      • 6.7.6 Security
      • 6.7.7 Timber doors and windows
      • 6.7.8 Non-timber doors and windows
      • 6.7.9 Ironmongery
      • 6.7.10 Material storage and protection
      • 6.7.11 Installation
      • 6.7.12 Completed work
      • Figure reference table
    • 6.8 Fireplaces, chimneys and flues
      • 6.8.1 Compliance
      • 6.8.2 Provision of information
      • 6.8.3 Solid fuel – fireplaces and hearths
      • 6.8.4 Solid fuel – combustion air
      • 6.8.5 Solid fuel – flue pipes
      • 6.8.6 Solid fuel – chimneys
      • 6.8.7 Solid fuel – outlets and terminals
      • 6.8.8 Gas – fireplaces and hearths
      • 6.8.9 Gas – combustion air
      • 6.8.10 Gas – flue pipes
      • 6.8.11 Gas – chimneys
      • 6.8.12 Gas – outlets and terminals
      • 6.8.13 Oil – fireplaces and hearths
      • 6.8.14 Oil – combustion air
      • 6.8.15 Oil – flue pipes
      • 6.8.16 Oil – chimneys
      • 6.8.17 Oil – outlets and terminals
      • 6.8.18 All – fireplaces and hearths
      • 6.8.19 All – fireplace surrounds
      • 6.8.20 All – flue pipes
      • 6.8.21 All – flue liners
      • 6.8.22 All – flues
      • 6.8.23 All – chimneys
      • 6.8.24 Masonry
      • 6.8.25 Mortar
      • 6.8.26 DPC
      • 6.8.27 Flashings
      • 6.8.28 Terminals
      • 6.8.29 Flue testing
      • 6.8.30 Further information
    • 6.9 Curtain walling and cladding
      • 6.9.1 Compliance
      • 6.9.2 Provision of information
      • 6.9.3 Certification
      • 6.9.4 Loads
      • 6.9.5 Support and fixings
      • 6.9.6 Durability
      • 6.9.7 Interfaces
      • 6.9.8 Insulation
      • 6.9.9 Damp proofing and vapour control
      • 6.9.10 Installation and tolerances
      • 6.9.11 Electrical continuity and earth bonding
      • 6.9.12 Maintenance
      • 6.9.13 Glazing, gaskets and sealants
      • 6.9.14 Cavity barriers and firestops
      • 6.9.15 Ventilation screens
      • 6.9.16 Handling and storage
      • 6.9.17 Curtain walling
      • 6.9.18 Rainscreen cladding
      • 6.9.19 Insulated render and brick slip cladding
    • 6.10 Light steel framed walls and floors
      • 6.10.1 Compliance
      • 6.10.2 Provision of information
      • 6.10.3 Structural certification
      • 6.10.4 Structural design of load-bearing floors and walls
      • 6.10.5 Structural design of infill walls
      • 6.10.6 Roofs
      • 6.10.7 Steel and fixings
      • 6.10.8 Detailing of steel joists
      • 6.10.9 Restraint
      • 6.10.10 Construction of load-bearing walls and external infill walls
      • 6.10.11 Interfaces with staircases
      • 6.10.12 Fixing floor decking and ceilings
      • 6.10.13 Other design issues
      • 6.10.14 Behaviour in relation to fire
      • 6.10.15 Acoustic performance
      • 6.10.16 Moisture control
      • 6.10.17 Insulation
      • 6.10.18 Air and vapour control layers
      • 6.10.19 Breather membranes
      • 6.10.20 Cladding, lining and sheathing boards
      • 6.10.21 Wall ties
      • 6.10.22 Services
      • 6.10.23 Further information
      • Figure reference table
    • 6.11 Render
      • 6.11.1 Compliance
      • 6.11.2 Provision of information
      • 6.11.3 Weather conditions
      • 6.11.4 Backgrounds
      • 6.11.5 Accommodation of movement
      • 6.11.6 Mixes
      • 6.11.7 Detailing
      • 6.11.8 Render onto board backgrounds
      • 6.11.9 Finishes
      • Figure reference table
  • 7 Roofs
    • 7.1 Flat roofs, terraces and balconies
      • 7.1.1 Compliance
      • 7.1.2 Provision of information
      • 7.1.3 Flat roof, terrace and balcony general design
      • 7.1.4 Drainage
      • 7.1.5 Flat roof, terrace and balcony structural design
      • 7.1.6 Timber structure and deck
      • 7.1.7 Concrete decks
      • 7.1.8 Profiled self-supporting metal roof decks
      • 7.1.9 Profiled self-supporting metal roofing
      • 7.1.10 Thermal insulation and vapour control
      • 7.1.11 Waterproofing layer and surface treatments
      • 7.1.12 Green and biodiverse (brown roofs) – including roof gardens
      • 7.1.13 Blue roofs
      • 7.1.14 Raised and buried podiums
      • 7.1.15 Detailing of flat roofs
      • 7.1.16 Accessible thresholds and upstands
      • 7.1.17 Metal balcony decking systems
      • 7.1.18 Parapets and guarding to terraces and balconies
    • 7.2 Pitched roofs
      • 7.2.1 Compliance
      • 7.2.2 Provision of information
      • 7.2.3 Design of pitched roofs
      • 7.2.4 Protection of trusses
      • 7.2.5 Durability
      • 7.2.6 Wall plates
      • 7.2.7 Joints and connections
      • 7.2.8 Restraint
      • 7.2.9 Bracing for trussed rafter roofs
      • 7.2.10 Strutting for site formed attic trusses and cut roofs that form a floor
      • 7.2.11 Support for equipment
      • 7.2.12 Access
      • 7.2.13 Dormer construction
      • 7.2.14 Underlay, sarking boards and sheets
      • 7.2.15 Ventilation, vapour control and insulation
      • 7.2.16 Fire-stopping and cavity barriers
      • 7.2.17 Battens
      • 7.2.18 Roof coverings
      • 7.2.19 Fixing tiles and slates
      • 7.2.20 Weathering details
      • 7.2.21 Valleys and hidden gutters
      • 7.2.22 Drainage
      • 7.2.23 Fascias and trim
      • 7.2.24 Spandrel panels in cold roofs
      • 7.2.25 Roof cassette systems
      • 7.2.26 Solar roof panels
      • Figure reference table
  • 8 Services
    • 8.1 Internal services
      • 8.1.1 Compliance
      • 8.1.2 Provision of information
      • 8.1.3 Water services and supply
      • 8.1.4 Cold water storage
      • 8.1.5 Gas services
      • 8.1.6 Electrical services
      • 8.1.7 Meter boxes
      • 8.1.8 Hot water services
      • 8.1.9 Unvented storage systems
      • 8.1.10 Soil and waste systems internal
      • Figure reference table
    • 8.2 Electrical generating technologies
      • 8.2.1 Solar photovoltaics (PV)
        • 8.2.1.1 Compliance
        • 8.2.1.2 Provision of information
        • 8.2.1.3 System design
        • 8.2.1.4 Building integration
        • 8.2.1.5 Fixing
        • 8.2.1.6 Access
        • 8.2.1.7 Electrical installation requirements
        • 8.2.1.8 Handling and storage
        • 8.2.1.9 Sequence of work
        • Figure reference table
      • 8.2.2 Wind turbines
        • 8.2.2.1 Compliance
        • 8.2.2.2 Provision of information
        • 8.2.2.3 System design
        • 8.2.2.4 Building integration
        • 8.2.2.5 Fixing
        • 8.2.2.6 Access
        • 8.2.2.7 Electrical installation requirements
        • 8.2.2.8 Handling and storage
        • 8.2.2.9 Sequence of work
        • Figure reference table
    • 8.3 Space heating systems
      • 8.3.1 Space heating
        • 8.3.1.1 Requirements
      • 8.3.2 Gas heating appliances
        • 8.3.2.1 Compliance
        • 8.3.2.2 Provision of information
        • 8.3.2.3 System design
        • 8.3.2.4 Building integration
        • 8.3.2.5 Fixing
        • 8.3.2.6 Access
        • 8.3.2.7 Electrical installation requirements
        • 8.3.2.8 Handling and storage
        • 8.3.2.9 Sequence of work
      • 8.3.3 Heat pumps
        • 8.3.3.1 Compliance
        • 8.3.3.2 Provision of information
        • 8.3.3.3 System design
        • 8.3.3.4 Pipes, insulation and protection from cold
        • 8.3.3.5 Ground collectors
        • 8.3.3.6 Building integration
        • 8.3.3.7 Fixing
        • 8.3.3.8 Access
        • 8.3.3.9 Electrical installation requirements
        • 8.3.3.10 Handling and storage
        • 8.3.3.11 Sequence of work
        • Figure reference table
      • 8.3.4 Biomass
        • 8.3.4.1 Compliance
        • 8.3.4.2 Clean air act
        • 8.3.4.3 Fuel storage
        • Figure reference table
    • 8.4 Ventilation
      • 8.4.1 Mechanical ventilation and heat recovery (MVHR)
        • 8.4.1.1 Compliance
        • 8.4.1.2 Provision of information
        • 8.4.1.3 System design
        • 8.4.1.4 Acoustics
        • 8.4.1.5 Building integration
        • 8.4.1.6 Ductwork
        • 8.4.1.7 Fixing and jointing of ductwork
        • 8.4.1.8 Access and operation
        • 8.4.1.9 Electrical installation requirements
        • 8.4.1.10 Handling and storage
        • 8.4.1.11 Commissioning and balancing
        • 8.4.1.12 Sequence of work
        • Figure reference tabl
      • 8.4.2 Mechanical extract ventilation systems (MEV)
        • 8.4.2.1 Compliance
        • 8.4.2.2 Provision of information
        • 8.4.2.3 System design
        • 8.4.2.4 Acoustics
        • 8.4.2.5 Building integration
        • 8.4.2.6 Ductwork
        • 8.4.2.7 Fixing and jointing of ductwork
        • 8.4.2.8 Access
        • 8.4.2.9 Electrical installation requirements
        • 8.4.2.10 Handling and storage
        • 8.4.2.11 Commissioning and balancing
        • 8.4.2.12 Sequence of work
        • Figure reference table
    • 8.5 LZC Hot water systems
      • 8.5.1 Solar thermal hot water systems
        • 8.5.1.1 Compliance
        • 8.5.1.2 Provision of information
        • 8.5.1.3 System design
        • 8.5.1.4 Safe discharge
        • 8.5.1.5 Building integration
        • 8.5.1.6 Fixing
        • 8.5.1.7 Access
        • 8.5.1.8 Electrical installation requirements
        • 8.5.1.9 Handling and storage
        • 8.5.1.10 Handover requirements
        • 8.5.1.11 Sequence of work
        • Figure reference table
    • 8.6 Installation and commissioning
      • 8.6.1 Compliance
      • 8.6.2 Installation
      • 8.6.3 Insulation to services
      • 8.6.4 Insulation performance
      • 8.6.5 Testing and commissioning
      • 8.6.6 Handover requirements
      • Figure reference table
  • 9 Finishes
    • 9.1 A consistent approach to finishes
      • 9.1.1 Compliance
      • 9.1.2 External walls
      • 9.1.3 Internal walls and ceilings
      • 9.1.4 Doors and windows
      • 9.1.5 Floors
      • 9.1.6 Glazing
      • 9.1.7 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.1.8 Fitted furniture
      • 9.1.9 Joint sealants
      • 9.1.10 Paint finishes
      • 9.1.11 Sanitary ware
      • 9.1.12 Other surfaces and components
      • 9.1.13 Pitched roof coverings
      • 9.1.14 Garages
      • 9.1.15 External works
      • 9.1.16 Further information
      • Figure reference table
    • 9.2 Wall and ceiling finishes
      • 9.2.1 Compliance
      • 9.2.2 Provision of information
      • 9.2.3 Plastering
      • 9.2.4 Dry lining
      • 9.2.5 Ceramic wall tiling
      • Figure reference table
    • 9.3 Floor finishes
      • 9.3.1 Compliance
      • 9.3.2 Provision of information
      • 9.3.3 Insulation
      • 9.3.4 Screed
      • 9.3.5 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.3.6 Wood finishes
      • 9.3.7 Flexible sheet and flexible tile finishes
      • 9.3.8 Asphalt finishes
      • 9.3.9 Staircase finishes
      • Figure reference table
    • 9.4 Finishes and fitments
      • 9.4.1 Compliance
      • 9.4.2 Provision of information
      • 9.4.3 General provisions – cupboards and fitments
      • 9.4.4 Finishings and internal trim
      • 9.4.5 Joinery
      • 9.4.6 Airing cupboards, cupboards, worktops and fitments
      • 9.4.7 Ironmongery, prefabricated items and other materials
      • 9.4.8 Protection and handover
      • Figure reference table
    • 9.5 Painting and decorating
      • 9.5.1 Compliance
      • 9.5.2 Provision of information
      • 9.5.3 Storage
      • 9.5.4 Conditions for painting and decorating
      • 9.5.5 Timber
      • 9.5.6 Steel
      • 9.5.7 Walls
      • 9.5.8 Wallpapering
      • 9.5.9 Other surfaces
      • 9.5.10 Completed painting and decorating
  • 10 External works
    • 10.1 Garages
      • 10.1.1 Compliance
      • 10.1.2 Provision of information
      • 10.1.3 Garage foundations
      • 10.1.4 Garage floors
      • 10.1.5 Garage walls
      • 10.1.6 Resistance to fire spread
      • 10.1.7 Security
      • 10.1.8 Doors and windows
      • 10.1.9 Garage roofs
      • 10.1.10 Permanent prefabricated garages and carports
      • 10.1.11 Services
      • Figure reference table
    • 10.2 Drives, paths and landscaping
      • 10.2.1 Compliance
      • 10.2.2 Provision of information
      • 10.2.3 Stability
      • 10.2.4 Freestanding walls and retaining structures
      • 10.2.5 Guarding and steps
      • 10.2.6 Drives, paths and landscaping
      • 10.2.7 Materials
      • 10.2.8 Garden areas within 3m of the home
      • 10.2.9 Garden areas
      • 10.2.10 External decking
      • 10.2.11 Landscaping
NHBC Hide Menu Show Menu

5.3 Drainage below ground

Also see:

4.2
BS EN 476
BS EN 13598-1 & 2
SFA-7

5.3.7 Design to avoid damage and blockages

Drainage systems shall minimise the risk of damage and blockage. Issues to be taken into account include:

  1. ground stability
  2. pipe runs
  3. pipe sizes
  4. gradients
  5. access and connections
  6. drainage covers and gully grids
  7. ground water
  8. flooding.

Ground stability#

Proper allowance should be made for ground movement.

Pipes should have flexible joints and additional precautions taken to prevent leakage where required. Where ground movement could be significant, for example in made-up ground or clay soils, the following issues should be taken into account:

  • the use of flexible pipes and flexible joints
  • design gradients that are steeper than the minimum requirements for flow rate and pipe size
  • a support system designed by an engineer in accordance with Technical Requirement R5
  • conditions where ground movement is likely to adversely affect the drain.

In non-uniform or saturated soils where movement at the trench bottom can be expected, soft spots should be removed and replaced with suitable material. Immediately after excavation, the protective blinding should be placed in the trench bottom.

Pipe runs#

Pipe runs should be designed to maintain a self-cleansing velocity (0.7 m/s). They should be as straight as practicable with minimal changes of direction. Bends should only occur in, or next to, inspection chambers and manhole covers. Curves should be slight so that blocked pipes can be cleared.

Pipe sizes#

Pipe sizes should be designed for the maximum peak load in accordance with BS EN 752.

Ground water drains and soakaways should be designed with sufficient capacity for normal weather conditions.

Gradients#

Design gradients should:

  • be as even as practicable
  • where flows are less than 1.0L/second, gradients for 100mm diameter pipes should not be flatter than 1:40
  • where peak flows exceed 1.0L/second, the gradients in Table 2 may be used:

Table 2: Minimum gradients

Pipe diameter (mm) Minimum gradient
1001:80
1501:150

Where peak flows are greater than 1.0L/second, 100mm pipes should serve a minimum of one WC and 150mm pipes should serve a minimum of five.

Access and connections#

To ensure that every length of drain can be rodded, the design should include appropriately located access points, such as:

  • rodding eyes
  • access chambers
  • inspection chambers
  • manholes.

NHBC technical illustration

NHBC technical illustration

NHBC technical illustration

All access points should be located as shown in the design information and should:

  • be accessible for rodding and cleaning
  • not cross boundaries or kerb lines.

Inspection chambers and manholes should:

  • be of sufficient size for the depth of invert, and
  • the invert depth for the fitting or chamber should not exceeded those given in Table 3.

Table 3: Minimum dimensions for access fittings and inspection chambers

NHBC technical illustration

Notes

1 The clear opening may be reduced by 20mm in order to provide further support for the cover and frame.
2 Drains up to 150mm.
3 A larger clear opening cover may be used in conjunction with restricted access. The size is restricted for health and safety reasons to deter entry.
4 300mm diameter Inspection chamber complying with BS EN 13598-1.
5 300mm diameter Adoptable Inspection chamber complying with BS EN 13598-2 may be used up to depth of 2m.

Table 4: Minimum dimension for manholes

NHBC technical illustration

Notes

1 Larger sizes may be required for manholes on bends or where there are junctions.
2 May be reduced to 600 x 600 where required by highway loading restrictions and subject to a safe system of work being specified.
3 Not applicable due to working space needed.
4 Minimum height of chamber in shafted manhole 2m from benching to underside of reducing slab.
5 Minimum clear space between ladder or steps and the opposite face of the shaft should be approximately 900mm.
6 Winch only; no steps or ladders, permanent or removable.
7 The minimum size of any manhole serving a sewer, ie, any drain serving more than one home, should be 1200mm x 675mm rectangular or 1200mm diameter.
8 Tables 3 & 4 have been reproduced from Tables 11 and 12 of Approved Document H by permission of HMSO.

Inspection chambers and manholes may be one of the following types:

  • open, half-round section channel with suitable benching
  • closed access, where covers have to be removed to gain access to the pipe.

Side branches to inspection chambers and manholes should discharge into the main channel no higher than half pipe level. Connections should be made obliquely in the direction of flow.

NHBC technical illustration

NHBC technical illustration

Traditional construction

The minimum specification for traditional manholes and inspection chambers is as follows:

NHBC technical illustration

Clay bricks for manholes should comply with BS EN 771 and:

  • be of low active soluble salt content
  • have a minimum compressive strength of 48N/mm2.

Engineering bricks are also suitable.

Concrete bricks for manholes should:

  • comply with BS EN 771
  • have a minimum crushing strength of 48N/mm2 with a minimum cement content of 350kg/m3 for foul drainage.

Calcium silicate bricks should comprise strength class 20 or above for foul drainage situations.

Proprietary systems

Proprietary systems should be:

  • in accordance with Technical Requirement R3
  • installed in accordance with manufacturers’ instructions.

Proprietary manholes should not be used at a depth greater than the manufacturer’s instructions.

Adaptors, couplers and sealing rings should be:

  • installed correctly and in accordance with the manufacturer’s instructions
  • treated using the lubricants and solvents specified.

Drainage covers and gully grids#

Manhole covers and gully grids should be of the correct type for the proposed location in accordance with Tables 5 and 5a.

Manhole covers used within buildings should be airtight and mechanically secured. Covers used for septic tanks, cesspits and settlement tanks should be lockable.

Manholes should be constructed or installed at the correct level so that the covers will align with the adjacent ground. Gullies should be adequately:

  • bedded
  • set level
  • square and kerbed.

Table 5: Type of covering and grid required for inspection and manhole covers and frames

Group 1Areas which can only be used by pedestrians and cyclists
Group 2Footways, pedestrian areas and comparable areas, car parks or car parking decks
Group 3For gully tops installed in the area of kerbside channels of roads which when measured from the kerb edge, extend a maximum of 0.5m into the carriageway and a maximum of 0.2m into the footway
Group 4Carriageways of roads, including pedestrian streets, hard shoulders and parking areas, and suitable for all types of road vehicles

Proprietary items, eg covers to plastic manholes, should be in accordance with manufacturers’ recommendations.

Table 5a: Gully grids in carriageways

Grade BFor use in carriageways of roads with cars and slow-moving normal commercial vehicles
Grade A class 2For use in carriageways of roads
Grade A class 1For use in carriageways of roads (gully grids of permanent non-rock design)

Ground water#

Foul and surface water drainage systems should prevent the ingress of ground water.

Flooding#

Where there is a risk of flooding, the advice of the relevant river authority should be followed.

5.3.6 Ground water drainage 5.3.8 Durability

Last updated: 2nd January 2024

Back to top ⇧

NHBC Download

NHBC Standards 2024
Complete

NHBC Download

NHBC Standards 2024
Chapter 5

NHBC Standards 2024

Menu 3D Download Print Search Account Logout

Technical Disclaimer: The NHBC Standards are produced by NHBC as guidance solely for our builder customers as to how to interpret the technical requirements in relation to the warranty cover provided by NHBC under its Buildmark, Buildmark Choice, Buildmark Link, Buildmark Solo, Buildmark Connect or any similar product from time to time. It has not been created or intended for distribution or use outside of that purpose. The information contained in the NHBC Standards do not constitute advice and is not to be relied upon by any third party. Nothing in the NHBC Standards is intended to, nor should it be taken to, create any legal or contractual relationship. Any third party who chooses to rely upon the information contained in the NHBC Standards shall do so entirely at their own risk and NHBC accepts no duty of care or liability, however caused, in connection with its use or reliance by any third party.