NHBC
  • Home
  • 1 Welcome
    • 1.1 Contact us
    • 1.2 What’s changed
  • 2 Introduction
    • 2.1 The Standards and Technical Requirements
    • 2.2 3D Models
  • 3 General
    • 3.1 Concrete and its reinforcement
      • 3.1.1 Compliance
      • 3.1.2 Provision of information
      • 3.1.3 Storage of materials
      • 3.1.4 Site-mixed concrete
      • 3.1.5 Ready-mixed concrete
      • 3.1.6 Concrete specification
      • 3.1.7 Admixtures
      • 3.1.8 Special types of concrete
      • 3.1.9 Design of reinforced concrete
      • 3.1.10 Installation of reinforcement
      • 3.1.11 Blinding concrete
      • 3.1.12 Formwork
      • 3.1.13 Before concreting
      • 3.1.14 Casting
      • 3.1.15 Curing
      • 3.1.16 Testing
      • 3.1.17 Glossary
      • Figure reference table
    • 3.2 Cold weather working
      • 3.2.1 Compliance
      • 3.2.2 External conditions
      • 3.2.3 Materials
      • 3.2.4 Concreting
      • 3.2.5 Masonry
      • 3.2.6 Rendering, plastering and screeding
      • 3.2.7 Admixtures
      • 3.2.8 Painting
    • 3.3 Timber preservation (natural solid timber)
      • 3.3.1 Compliance
      • 3.3.2 Durability
      • 3.3.3 Sitework
      • 3.3.4 Protection and storage
      • 3.3.5 Treatment of cut surfaces
      • 3.3.6 Compatibility with metal
      • 3.3.7 Further information
      • Figure reference table
  • 4 Foundations
    • 4.1 Land quality – managing ground conditions
      • 4.1.1 Compliance
      • 4.1.2 Initial Assessment – desk study (all sites)
      • 4.1.3 Initial Assessment – walkover survey (all sites)
      • 4.1.4 Initial Assessment – results
      • 4.1.5 Basic Investigation (sites where hazards are not identified or suspected)
      • 4.1.6 Detailed Investigation (sites where hazards are identified or suspected)
      • 4.1.7 Managing the risks (sites where hazards are found)
      • 4.1.8 Unforeseen hazards
      • 4.1.9 Documentation and verification
      • 4.1.10 Guidance for investigations
      • 4.1.11 Further information
      • Figure reference table
    • 4.2 Building near trees
      • 4.2.1 Compliance
      • 4.2.2 Provision of information
      • 4.2.3 Building near trees
      • 4.2.4 The effects of trees on shrinkable soils
      • 4.2.5 Foundations in all soil types
      • 4.2.6 Excavation of foundations
      • 4.2.7 Foundations in shrinkable soils
      • 4.2.8 Design and construction of foundations in shrinkable soils
      • 4.2.9 Foundation depths for specific conditions in shrinkable soils
      • 4.2.10 Heave precautions
      • 4.2.11 New drainage
      • 4.2.12 Method of assessment of foundation depths using charts
      • 4.2.13 Method of assessment of foundation depths using tables
      • 4.2.14 Worked example
      • 4.2.15 Further information
    • 4.3 Strip and trench fill foundations
      • 4.3.1 Compliance
      • 4.3.2 Provision of information
      • 4.3.3 Ground conditions
      • 4.3.4 Hazardous ground
      • 4.3.5 Setting out
      • 4.3.6 Services and drainage
      • 4.3.7 Safe transmission of loads
      • 4.3.8 Sloping ground and stepped foundations
      • 4.3.9 Excavations
      • 4.3.10 Reinforcement
      • 4.3.11 Concrete
      • 4.3.12 Movement joints
      • 4.3.13 Construction joints
    • 4.4 Raft, pile, pier and beam foundations
      • 4.4.1 Compliance
      • 4.4.2 Provision of information
      • 4.4.3 Site conditions
      • 4.4.4 Hazardous ground
      • 4.4.5 Services and drainage
      • 4.4.6 Safe transmission of loads
      • 4.4.7 Construction
      • 4.4.8 Engineer checks
      • 4.4.9 Compressible materials
      • 4.4.10 Reinforcement
      • 4.4.11 Concrete
      • 4.4.12 Movement joints
      • 4.4.13 Resistance to moisture
    • 4.5 Vibratory ground improvement techniques
      • 4.5.1 Compliance
      • 4.5.2 Hazardous sites and ground hazards
      • 4.5.3 Desk study and site investigation
      • 4.5.4 Confirmation of suitability for treatment
      • 4.5.5 Suitability of ground conditions
      • 4.5.6 Compatibility of the ground, design and treatment
      • 4.5.7 Acceptable methods
      • 4.5.8 Materials for use as fill
      • 4.5.9 Granular material
      • 4.5.10 Sitework
      • 4.5.11 Adjacent excavations
      • 4.5.12 Verification of completed treatment
    • 4.6 Engineered fill
      • 4.6.1 Compliance
      • 4.6.2 Provision of information
      • 4.6.3 Hazardous sites and ground hazards
      • 4.6.4 Desk study and ground investigation
      • 4.6.5 Suitability of ground conditions
      • 4.6.6 Materials for use as engineered fill
      • 4.6.7 Design and specification of earthworks
      • 4.6.8 Compatibility of fill with foundations, infrastructure and external works
      • 4.6.9 Acceptable methods of earthworks filling
      • 4.6.10 Site work
      • 4.6.11 Adjacent excavations
      • 4.6.12 Verification of engineered fill
      • 4.6.13 Reporting
      • Figure reference table
  • 5 Substructure, Ground Floors, Drainage and Basements
    • 5.1 Substructure and ground-bearing floors
      • 5.1.1 Compliance
      • 5.1.2 Provision of information
      • 5.1.3 Transfer of loads
      • 5.1.4 Ground conditions
      • 5.1.5 Services and drainage
      • 5.1.6 Ground below fill
      • 5.1.7 Fill below floors
      • 5.1.8 Infill up to 600mm deep
      • 5.1.9 Materials used for fill
      • 5.1.10 Harmful or toxic materials
      • 5.1.11 Regulatory solutions
      • 5.1.12 Walls below the DPC
      • 5.1.13 Durability
      • 5.1.14 Mortar
      • 5.1.15 Wall ties
      • 5.1.16 Blinding
      • 5.1.17 Ground floor slab and concrete
      • 5.1.18 Laying the ground-bearing floor slab
      • 5.1.19 Damp proof course
      • 5.1.20 Damp proofing concrete floors
      • 5.1.21 Thermal insulation
      • 5.1.22 Installation of insulation
      • 5.1.23 Further information
      • Figure reference table
    • 5.2 Suspended ground floors
      • 5.2.1 Compliance
      • 5.2.2 Provision of information
      • 5.2.3 Contaminants
      • 5.2.4 Proprietary systems
      • 5.2.5 Transfer of loads: concrete floors
      • 5.2.6 Reinforced concrete
      • 5.2.7 Construction of suspended concrete ground floors
      • 5.2.8 Transfer of loads: timber floors
      • 5.2.9 Thermal insulation and thermal bridging
      • 5.2.10 Damp proofing and ventilation
      • 5.2.11 Floor finishes
      • 5.2.12 Floor decking
    • 5.3 Drainage below ground
      • 5.3.1 Compliance
      • 5.3.2 Provision of information
      • 5.3.3 Preliminary work
      • 5.3.4 Foul and surface water disposal
      • 5.3.5 Drainage system performance
      • 5.3.6 Ground water drainage
      • 5.3.7 Design to avoid damage and blockages
      • 5.3.8 Durability
      • 5.3.9 Septic tanks and cesspools
      • 5.3.10 Septic tank outputs
      • 5.3.11 Surface water soakaways
      • 5.3.12 Component requirements
      • 5.3.13 Excavation
      • 5.3.14 Protection of pipework
      • 5.3.15 Laying pipework
      • 5.3.16 Protection of work
      • 5.3.17 Testing
    • 5.4 Waterproofing of basements and other below ground structures
      • 5.4.1 Compliance
      • 5.4.2 Provision of information
      • 5.4.3 Waterproofing
      • 5.4.4 Ground conditions
      • 5.4.5 Structural stability
      • 5.4.6 Design considerations
      • 5.4.7 Waterproofing systems
      • 5.4.8 Handling, storage and protection
      • 5.4.9 Buried podiums
      • Figure reference table
  • 6 Superstructure (excluding roofs)
    • 6.1 External masonry walls
      • 6.1.1 Compliance
      • 6.1.2 Provision of information
      • 6.1.3 Structural design
      • 6.1.4 Fire resistance
      • 6.1.5 Acoustic resistance
      • 6.1.6 Exposure
      • 6.1.7 Thermal insulation
      • 6.1.8 Concrete blocks
      • 6.1.9 Bricks
      • 6.1.10 Stone masonry
      • 6.1.11 Construction of masonry walls
      • 6.1.12 Lintels
      • 6.1.13 Materials suitable for mortar
      • 6.1.14 Mortar
      • 6.1.15 Render
      • 6.1.16 Cladding
      • 6.1.17 DPCs and cavity trays
      • 6.1.18 Wall ties, bed joint reinforcements and windposts
      • 6.1.19 Handling materials
      • 6.1.20 Protection of the works during construction
      • Figure reference table
    • 6.2 External timber framed walls
      • 6.2.1 Compliance
      • 6.2.2 Provision of information
      • 6.2.3 Design checking and certification
      • 6.2.4 Load-bearing walls
      • 6.2.5 Fixing the frame
      • 6.2.6 Nails and staples
      • 6.2.7 Sheathing
      • 6.2.8 Differential movement
      • 6.2.9 Fire resistance
      • 6.2.10 Protection from moisture
      • 6.2.11 Timber preservation
      • 6.2.12 Air and vapour control layers
      • 6.2.13 Breather membranes
      • 6.2.14 Wall ties and fixings
      • 6.2.15 Insulation
      • Figure reference table
    • 6.3 Internal walls
      • 6.3.1 Compliance
      • 6.3.2 Provision of information
      • 6.3.3 Supporting load-bearing internal walls
      • 6.3.4 Masonry walls
      • 6.3.5 Load-bearing timber walls
      • 6.3.6 Fire resistance
      • 6.3.7 Sound insulation
      • 6.3.8 Partitions: internal non load-bearing
      • 6.3.9 Construction of timber partitions
      • 6.3.10 Construction of steel framed partitions
      • 6.3.11 Construction of proprietary systems
      • 6.3.12 Plasterboard
      • 6.3.13 Damp proof courses
      • 6.3.14 Components
      • Figure reference table
    • 6.4 Timber and concrete upper floors
      • 6.4.1 Compliance
      • 6.4.2 Provision of information
      • 6.4.3 Upper floor design
      • 6.4.4 Fire spread
      • 6.4.5 Sound insulation
      • 6.4.6 In-situ concrete floors and concreting
      • 6.4.7 Precast concrete
      • 6.4.8 Timber joist spans
      • 6.4.9 Timber joist performance
      • 6.4.10 Construction of timber floors
      • 6.4.11 Joists supported by intermediate walls
      • 6.4.12 Joists connected to steel
      • 6.4.13 Joists into hangers
      • 6.4.14 Timber joist and restraint strap
      • 6.4.15 Strutting
      • 6.4.16 Joists and openings
      • 6.4.17 Multiple joists
      • 6.4.18 Notching and drilling
      • 6.4.19 Floor decking
      • 6.4.20 Floating floors or floors between homes
    • 6.5 Steelwork
      • 6.5.1 Compliance
      • 6.5.2 Design guidance
      • 6.5.3 Steel grade and coatings
      • 6.5.4 Installation and support
      • 6.5.5 Padstones
      • 6.5.6 Connections
      • 6.5.7 Examples
      • Figure reference table
    • 6.6 Staircases
      • 6.6.1 Compliance
      • 6.6.2 Provision of information
      • 6.6.3 Fire precautions
      • 6.6.4 Lighting
      • 6.6.5 Glazing
      • 6.6.6 Structural design
      • 6.6.7 Headroom and width
      • 6.6.8 Design of steps
      • 6.6.9 Landings
      • 6.6.10 Guarding
      • 6.6.11 Handrails
      • 6.6.12 Staircases made from timber and wood-based products
      • 6.6.13 Concrete staircases
      • 6.6.14 Steel staircases
      • 6.6.15 Proprietary staircase units
      • 6.6.16 Protection
      • Figure reference table
    • 6.7 Doors, windows, and glazing
      • 6.7.1 Compliance
      • 6.7.2 Provision of information
      • 6.7.3 In-service performance
      • 6.7.4 Coupled door and window frame assemblies
      • 6.7.5 Glazing
      • 6.7.6 Security
      • 6.7.7 Timber doors and windows
      • 6.7.8 Non-timber doors and windows
      • 6.7.9 Ironmongery
      • 6.7.10 Material storage and protection
      • 6.7.11 Installation
      • 6.7.12 Completed work
      • Figure reference table
    • 6.8 Fireplaces, chimneys and flues
      • 6.8.1 Compliance
      • 6.8.2 Provision of information
      • 6.8.3 Solid fuel – fireplaces and hearths
      • 6.8.4 Solid fuel – combustion air
      • 6.8.5 Solid fuel – flue pipes
      • 6.8.6 Solid fuel – chimneys
      • 6.8.7 Solid fuel – outlets and terminals
      • 6.8.8 Gas – fireplaces and hearths
      • 6.8.9 Gas – combustion air
      • 6.8.10 Gas – flue pipes
      • 6.8.11 Gas – chimneys
      • 6.8.12 Gas – outlets and terminals
      • 6.8.13 Oil – fireplaces and hearths
      • 6.8.14 Oil – combustion air
      • 6.8.15 Oil – flue pipes
      • 6.8.16 Oil – chimneys
      • 6.8.17 Oil – outlets and terminals
      • 6.8.18 All – fireplaces and hearths
      • 6.8.19 All – fireplace surrounds
      • 6.8.20 All – flue pipes
      • 6.8.21 All – flue liners
      • 6.8.22 All – flues
      • 6.8.23 All – chimneys
      • 6.8.24 Masonry
      • 6.8.25 Mortar
      • 6.8.26 DPC
      • 6.8.27 Flashings
      • 6.8.28 Terminals
      • 6.8.29 Flue testing
      • 6.8.30 Further information
    • 6.9 Curtain walling and cladding
      • 6.9.1 Compliance
      • 6.9.2 Provision of information
      • 6.9.3 Certification
      • 6.9.4 Loads
      • 6.9.5 Support and fixings
      • 6.9.6 Durability
      • 6.9.7 Interfaces
      • 6.9.8 Insulation
      • 6.9.9 Damp proofing and vapour control
      • 6.9.10 Installation and tolerances
      • 6.9.11 Electrical continuity and earth bonding
      • 6.9.12 Maintenance
      • 6.9.13 Glazing, gaskets and sealants
      • 6.9.14 Cavity barriers and firestops
      • 6.9.15 Ventilation screens
      • 6.9.16 Handling and storage
      • 6.9.17 Curtain walling
      • 6.9.18 Rainscreen cladding
      • 6.9.19 Insulated render and brick slip cladding
    • 6.10 Light steel framed walls and floors
      • 6.10.1 Compliance
      • 6.10.2 Provision of information
      • 6.10.3 Structural certification
      • 6.10.4 Structural design of load-bearing floors and walls
      • 6.10.5 Structural design of infill walls
      • 6.10.6 Roofs
      • 6.10.7 Steel and fixings
      • 6.10.8 Detailing of steel joists
      • 6.10.9 Restraint
      • 6.10.10 Construction of load-bearing walls and external infill walls
      • 6.10.11 Interfaces with staircases
      • 6.10.12 Fixing floor decking and ceilings
      • 6.10.13 Other design issues
      • 6.10.14 Behaviour in relation to fire
      • 6.10.15 Acoustic performance
      • 6.10.16 Moisture control
      • 6.10.17 Insulation
      • 6.10.18 Air and vapour control layers
      • 6.10.19 Breather membranes
      • 6.10.20 Cladding, lining and sheathing boards
      • 6.10.21 Wall ties
      • 6.10.22 Services
      • 6.10.23 Further information
      • Figure reference table
    • 6.11 Render
      • 6.11.1 Compliance
      • 6.11.2 Provision of information
      • 6.11.3 Weather conditions
      • 6.11.4 Backgrounds
      • 6.11.5 Accommodation of movement
      • 6.11.6 Mixes
      • 6.11.7 Detailing
      • 6.11.8 Render onto board backgrounds
      • 6.11.9 Finishes
      • Figure reference table
  • 7 Roofs
    • 7.1 Flat roofs, terraces and balconies
      • 7.1.1 Compliance
      • 7.1.2 Provision of information
      • 7.1.3 Flat roof, terrace and balcony general design
      • 7.1.4 Drainage
      • 7.1.5 Flat roof, terrace and balcony structural design
      • 7.1.6 Timber structure and deck
      • 7.1.7 Concrete decks
      • 7.1.8 Profiled self-supporting metal roof decks
      • 7.1.9 Profiled self-supporting metal roofing
      • 7.1.10 Thermal insulation and vapour control
      • 7.1.11 Waterproofing layer and surface treatments
      • 7.1.12 Green and biodiverse (brown roofs) – including roof gardens
      • 7.1.13 Blue roofs
      • 7.1.14 Raised and buried podiums
      • 7.1.15 Detailing of flat roofs
      • 7.1.16 Accessible thresholds and upstands
      • 7.1.17 Metal balcony decking systems
      • 7.1.18 Parapets and guarding to terraces and balconies
    • 7.2 Pitched roofs
      • 7.2.1 Compliance
      • 7.2.2 Provision of information
      • 7.2.3 Design of pitched roofs
      • 7.2.4 Protection of trusses
      • 7.2.5 Durability
      • 7.2.6 Wall plates
      • 7.2.7 Joints and connections
      • 7.2.8 Restraint
      • 7.2.9 Bracing for trussed rafter roofs
      • 7.2.10 Strutting for site formed attic trusses and cut roofs that form a floor
      • 7.2.11 Support for equipment
      • 7.2.12 Access
      • 7.2.13 Dormer construction
      • 7.2.14 Underlay, sarking boards and sheets
      • 7.2.15 Ventilation, vapour control and insulation
      • 7.2.16 Fire-stopping and cavity barriers
      • 7.2.17 Battens
      • 7.2.18 Roof coverings
      • 7.2.19 Fixing tiles and slates
      • 7.2.20 Weathering details
      • 7.2.21 Valleys and hidden gutters
      • 7.2.22 Drainage
      • 7.2.23 Fascias and trim
      • 7.2.24 Spandrel panels in cold roofs
      • 7.2.25 Roof cassette systems
      • 7.2.26 Solar roof panels
      • Figure reference table
  • 8 Services
    • 8.1 Internal services
      • 8.1.1 Compliance
      • 8.1.2 Provision of information
      • 8.1.3 Water services and supply
      • 8.1.4 Cold water storage
      • 8.1.5 Gas services
      • 8.1.6 Electrical services
      • 8.1.7 Meter boxes
      • 8.1.8 Hot water services
      • 8.1.9 Unvented storage systems
      • 8.1.10 Soil and waste systems internal
      • Figure reference table
    • 8.2 Electrical generating technologies
      • 8.2.1 Solar photovoltaics (PV)
        • 8.2.1.1 Compliance
        • 8.2.1.2 Provision of information
        • 8.2.1.3 System design
        • 8.2.1.4 Building integration
        • 8.2.1.5 Fixing
        • 8.2.1.6 Access
        • 8.2.1.7 Electrical installation requirements
        • 8.2.1.8 Handling and storage
        • 8.2.1.9 Sequence of work
        • Figure reference table
      • 8.2.2 Wind turbines
        • 8.2.2.1 Compliance
        • 8.2.2.2 Provision of information
        • 8.2.2.3 System design
        • 8.2.2.4 Building integration
        • 8.2.2.5 Fixing
        • 8.2.2.6 Access
        • 8.2.2.7 Electrical installation requirements
        • 8.2.2.8 Handling and storage
        • 8.2.2.9 Sequence of work
        • Figure reference table
    • 8.3 Space heating systems
      • 8.3.1 Space heating
        • 8.3.1.1 Requirements
      • 8.3.2 Gas heating appliances
        • 8.3.2.1 Compliance
        • 8.3.2.2 Provision of information
        • 8.3.2.3 System design
        • 8.3.2.4 Building integration
        • 8.3.2.5 Fixing
        • 8.3.2.6 Access
        • 8.3.2.7 Electrical installation requirements
        • 8.3.2.8 Handling and storage
        • 8.3.2.9 Sequence of work
      • 8.3.3 Heat pumps
        • 8.3.3.1 Compliance
        • 8.3.3.2 Provision of information
        • 8.3.3.3 System design
        • 8.3.3.4 Pipes, insulation and protection from cold
        • 8.3.3.5 Ground collectors
        • 8.3.3.6 Building integration
        • 8.3.3.7 Fixing
        • 8.3.3.8 Access
        • 8.3.3.9 Electrical installation requirements
        • 8.3.3.10 Handling and storage
        • 8.3.3.11 Sequence of work
        • Figure reference table
      • 8.3.4 Biomass
        • 8.3.4.1 Compliance
        • 8.3.4.2 Clean air act
        • 8.3.4.3 Fuel storage
        • Figure reference table
    • 8.4 Ventilation
      • 8.4.1 Mechanical ventilation and heat recovery (MVHR)
        • 8.4.1.1 Compliance
        • 8.4.1.2 Provision of information
        • 8.4.1.3 System design
        • 8.4.1.4 Acoustics
        • 8.4.1.5 Building integration
        • 8.4.1.6 Ductwork
        • 8.4.1.7 Fixing and jointing of ductwork
        • 8.4.1.8 Access and operation
        • 8.4.1.9 Electrical installation requirements
        • 8.4.1.10 Handling and storage
        • 8.4.1.11 Commissioning and balancing
        • 8.4.1.12 Sequence of work
        • Figure reference tabl
      • 8.4.2 Mechanical extract ventilation systems (MEV)
        • 8.4.2.1 Compliance
        • 8.4.2.2 Provision of information
        • 8.4.2.3 System design
        • 8.4.2.4 Acoustics
        • 8.4.2.5 Building integration
        • 8.4.2.6 Ductwork
        • 8.4.2.7 Fixing and jointing of ductwork
        • 8.4.2.8 Access
        • 8.4.2.9 Electrical installation requirements
        • 8.4.2.10 Handling and storage
        • 8.4.2.11 Commissioning and balancing
        • 8.4.2.12 Sequence of work
        • Figure reference table
    • 8.5 LZC Hot water systems
      • 8.5.1 Solar thermal hot water systems
        • 8.5.1.1 Compliance
        • 8.5.1.2 Provision of information
        • 8.5.1.3 System design
        • 8.5.1.4 Safe discharge
        • 8.5.1.5 Building integration
        • 8.5.1.6 Fixing
        • 8.5.1.7 Access
        • 8.5.1.8 Electrical installation requirements
        • 8.5.1.9 Handling and storage
        • 8.5.1.10 Handover requirements
        • 8.5.1.11 Sequence of work
        • Figure reference table
    • 8.6 Installation and commissioning
      • 8.6.1 Compliance
      • 8.6.2 Installation
      • 8.6.3 Insulation to services
      • 8.6.4 Insulation performance
      • 8.6.5 Testing and commissioning
      • 8.6.6 Handover requirements
      • Figure reference table
  • 9 Finishes
    • 9.1 A consistent approach to finishes
      • 9.1.1 Compliance
      • 9.1.2 External walls
      • 9.1.3 Internal walls and ceilings
      • 9.1.4 Doors and windows
      • 9.1.5 Floors
      • 9.1.6 Glazing
      • 9.1.7 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.1.8 Fitted furniture
      • 9.1.9 Joint sealants
      • 9.1.10 Paint finishes
      • 9.1.11 Sanitary ware
      • 9.1.12 Other surfaces and components
      • 9.1.13 Pitched roof coverings
      • 9.1.14 Garages
      • 9.1.15 External works
      • 9.1.16 Further information
      • Figure reference table
    • 9.2 Wall and ceiling finishes
      • 9.2.1 Compliance
      • 9.2.2 Provision of information
      • 9.2.3 Plastering
      • 9.2.4 Dry lining
      • 9.2.5 Ceramic wall tiling
      • Figure reference table
    • 9.3 Floor finishes
      • 9.3.1 Compliance
      • 9.3.2 Provision of information
      • 9.3.3 Insulation
      • 9.3.4 Screed
      • 9.3.5 Ceramic, concrete, terrazzo and similar tile finishes
      • 9.3.6 Wood finishes
      • 9.3.7 Flexible sheet and flexible tile finishes
      • 9.3.8 Asphalt finishes
      • 9.3.9 Staircase finishes
      • Figure reference table
    • 9.4 Finishes and fitments
      • 9.4.1 Compliance
      • 9.4.2 Provision of information
      • 9.4.3 General provisions – cupboards and fitments
      • 9.4.4 Finishings and internal trim
      • 9.4.5 Joinery
      • 9.4.6 Airing cupboards, cupboards, worktops and fitments
      • 9.4.7 Ironmongery, prefabricated items and other materials
      • 9.4.8 Protection and handover
      • Figure reference table
    • 9.5 Painting and decorating
      • 9.5.1 Compliance
      • 9.5.2 Provision of information
      • 9.5.3 Storage
      • 9.5.4 Conditions for painting and decorating
      • 9.5.5 Timber
      • 9.5.6 Steel
      • 9.5.7 Walls
      • 9.5.8 Wallpapering
      • 9.5.9 Other surfaces
      • 9.5.10 Completed painting and decorating
  • 10 External works
    • 10.1 Garages
      • 10.1.1 Compliance
      • 10.1.2 Provision of information
      • 10.1.3 Garage foundations
      • 10.1.4 Garage floors
      • 10.1.5 Garage walls
      • 10.1.6 Resistance to fire spread
      • 10.1.7 Security
      • 10.1.8 Doors and windows
      • 10.1.9 Garage roofs
      • 10.1.10 Permanent prefabricated garages and carports
      • 10.1.11 Services
      • Figure reference table
    • 10.2 Drives, paths and landscaping
      • 10.2.1 Compliance
      • 10.2.2 Provision of information
      • 10.2.3 Stability
      • 10.2.4 Freestanding walls and retaining structures
      • 10.2.5 Guarding and steps
      • 10.2.6 Drives, paths and landscaping
      • 10.2.7 Materials
      • 10.2.8 Garden areas within 3m of the home
      • 10.2.9 Garden areas
      • 10.2.10 External decking
      • 10.2.11 Landscaping
NHBC Hide Menu Show Menu

7.1 Flat roofs, terraces and balconies

7.1.6 Timber structure and deck

Timber flat roofs, balconies and terraces shall be of adequate strength and durability and be installed to form a satisfactory substrate for the waterproofing system. Issues to be considered include:

  • structure and durability
  • joist hangers, straps and strutting
  • installing timber decks.

Structure and durability#

Structural elements of balconies should have a service life of at least 60 years.

Timber in balconies should be limited to elements which are supported by materials other than timber. Timber should not be used for:

  • gallows brackets supporting a balcony
  • posts or columns supporting a balcony
  • guardrails including their support
  • infill joists
  • cantilevered joists or decks.

Decking boards should be specified and fixed in accordance with:

  • guidance from the Timber Decking and Cladding Association, or
  • an engineer’s design, in accordance with Technical Requirement R5.

The use of timber in balcony and terrace constructions may also be restricted by fire protection requirements set out in the Building Regulations.

Timber, including solid and engineered joists, should be:

  • checked for conformity with the design upon delivery
  • rejected where excessively wet, damaged or not of a suitable quality or shape
  • stored under cover to prevent wetting but avoid sweating
  • preservative treated or naturally durable, in accordance with Chapter 3.3 ‘Timber preservation (natural solid timber)’
  • retreated along the cut edges with a coloured preservative, where preservative treated timber has been cut
  • be temporarily covered to prevent wetting, unless the waterproofing is to be installed immediately.

Timber structure should:

  • be in accordance BSEN 1995-1-1 or appropriate load/span table published by TRADA in support of Building Regulations
  • be from regularised timber, dry graded to BS 4978 and marked ‘DRY’ or ‘KD’ where softwood is used internally
  • have I-joists or metal web joists specified in accordance with the manufacturer’s recommendations and not used where any part of the joists is exposed to external conditions
  • have joists which are sized and spaced in accordance with the design and at maximum 600mm centres
  • be level and, where necessary, using hard packing such as tiles or slates bedded in mortar to adjust joists (loose or soft packing, including timber, should not be used).

Timber decks should be formed from one of the materials listed in Tables 3, 4 and 5.

Table 3: Materials used for deck to flexible membrane roof coverings

MaterialMinimum thickness of deck (mm) ¹ 450mm joist centresMinimum thickness of deck (mm) ¹ 600mm joist centres
Plywood board to BS EN 636, Use Class 3.2, ‘S’, ²15 ⁴18 ⁴
Oriented strand board, to BS EN 300 type OSB315 18
Pre-treated timber planking, tongue and grooved (close boarded timber). Maximum plank width 100mm ³1919

Notes

1. Thickness of deck may need to be thicker to resist pull-out forces on fixings.

2. All square board edges to be supported.

3. Moisture content between 16-20% at time of fixing.

4. For curved roofs two layers of thinner boards to achieve min thickness.

Table 4: Materials used for deck for fully supported traditional hard metal roof coverings

MaterialMinimum thickness of deck (mm)
Plywood board to BS EN 636, Class 3.2, ‘S’ ¹ square edged with 2-3mm gaps between boards ³18 ²
Pre-treated timber square edged sarking boards, width 100-125mm with 3-5mm gaps between ⁴18

Notes

1. Avoid yellow and maritime pine or low-quality softwoods.

2. For curved roofs two layers of thinner boards to achieve min 18mm thickness.

3. All board edges to be supported.

4. Moisture content between 16-20% at time of fixing.

Table 5: Materials used for deck to lead roof coverings

MaterialMinimum thickness of deck (mm)
Plywood board to BS EN 636, Class 3.2 ‘S’ ¹ square edged with 3-5mm gaps between boards ³18 ²
Pre-treated softwood timber square edged sarking boards, width 100-125mm with 2-3mm gaps between ⁴18

Notes

1. Avoid oak, Douglas fir and western red cedar.

2. For curved roofs two layers of thinner boards to achieve min 18mm thickness.

3. All board edges to be supported.

4. Moisture content between 16-20% at time of fixing.

Joists hangers, straps and strutting#

Masonry carrying joist hangers should be level and at the correct height.

Mild steel straps and fixings should be protected against corrosion in accordance with BS EN 845-1.

Joist hangers should be:

  • in accordance with BS EN 845
  • the correct size for the timber joist or trimmer
  • fixed in accordance with the design.

Where holding-down straps are required to prevent the roof from lifting from the supporting structural, they should be:

  • spaced at a maximum of 2m centres at the perimeters
  • fixed with minimum of four hardened nails 4mm in diameter x 75mm long, or No 12 wood screws x 50mm long, into plugs (where fixed to masonry)
  • fixed with the lowest fixing secured within 150mm of the bottom of the vertical strap
  • 30mm x 2.5mm and 1m long
  • predrilled for fixings.

NHBC technical illustration

NHBC technical illustration

Strutting should be provided to prevent excessive movement, and:

  • be either herringbone type (timber 38mm x 38mm), solid blocking (38mm thick timber x 0.75 depth of joist) or proprietary steel strutting or I-joist sections
  • not prevent cross ventilation in cold roofs
  • spaced in accordance with Table 6.

Table 6: Spacing for strutting

Joist span (m)Rows of strutting
Up to 2.5None needed
2.5 – 4.5One (at centre of span)
Over 4.5Equally spaced along the span at maximum 2.5m centres

Installing timber decks#

When installing timber decks:

  • conditions should be dry, and materials protected from wetting until the roof is complete
  • the area of deck installed should be of a size which can be quickly covered in the event of rain
  • materials that have been damaged or adversely affected by moisture should be discarded
  • tops of boards should be laid flush with no deviation greater than 2mm
  • boards should be laid in a staggered pattern
  • cut edges should be treated to prevent moisture ingress
  • should have a minimum ‘good one side’
  • should have all nails and screws punched or countersunk below the surface of the board.
  • Should be free of sharp arises on external angles.

Plywood and oriented strand board (OSB) should:

  • have tongued and grooved boards installed with the long edges at right angles to the supporting firrings or joists, and short edges supported on a joist or nogging. Note: use square edge boards for support of hard metal and lead roofs
  • have edges of square edged boards supported on joists or noggings with movement gaps of 3-5mm between boards
  • have a minimum movement gap of 10mm (or 2mm per metre of boarding whichever is the greater) where boards abut a rigid upstand
  • be supported on noggings where the edges of boards situated along the roof perimeter do not coincide with joists, and where square edged boards within the roof area do not coincide with a joist
  • be fixed at a maximum of 100mm centres (unless the design specifies closer)
  • be fixed with flat-headed ring shank nails (minimum of 50mm long x 3mm for plywood, minimum of 3mm x 2.5 x board thickness for OSB) or screws of at least the same length.

OSB should be:

  • installed over supports in the direction indicated on the boards, with the stronger axis installed at right angles to the supporting joists
  • fixed a minimum of 8mm from the edge of the board.

NHBC technical illustration

Softwood tongued and grooved boarding should be:

  • closely clamped together with end joints staggered,
  • fixed with two ring shank nails to each joist or firring, with nail heads punched below the timber surface.

Cross Laminated Timber (CLT)

Due to the semi-impervious nature of CLT panels and the risk of trapping moisture in the panels during the construction period, CLT panels are not accepted for flat roof construction.

Structural insulated panels (SIPs) (used as self-supported deck)

Due to the difficulty in applying an effective AVCL to the warm side of a SIPs panel to prevent water vapour entering the panel, and the risk of trapping moisture in the panels during the construction period, SIPs panels are not accepted for warm flat roof construction.

7.1.5 Flat roof, terrace and balcony structural design 7.1.7 Concrete decks

Last updated: 2nd January 2024

Back to top ⇧

NHBC Download

NHBC Standards 2024
Complete

NHBC Download

NHBC Standards 2024
Chapter 7

NHBC Standards 2024

Menu 3D Download Print Search Account Logout

Technical Disclaimer: The NHBC Standards are produced by NHBC as guidance solely for our builder customers as to how to interpret the technical requirements in relation to the warranty cover provided by NHBC under its Buildmark, Buildmark Choice, Buildmark Link, Buildmark Solo, Buildmark Connect or any similar product from time to time. It has not been created or intended for distribution or use outside of that purpose. The information contained in the NHBC Standards do not constitute advice and is not to be relied upon by any third party. Nothing in the NHBC Standards is intended to, nor should it be taken to, create any legal or contractual relationship. Any third party who chooses to rely upon the information contained in the NHBC Standards shall do so entirely at their own risk and NHBC accepts no duty of care or liability, however caused, in connection with its use or reliance by any third party.